APO
SAP
Transactions
Master Data
TLB
100

Is called a plant in ECC.

Location in APO.

100

Migrates master and transaction between ECC and APO as needed

CIF

100

Review MRP elements, including planned demand and planned receipts, firmed receipts

MD04

100

Used to differentiate MTO or MTS with forecast consumption.  The ending letter “F” is used at the demand plants.  Manufacturing plant should not include F.  Once this field is updated, it will automatically update the procurement type on MRP 2 tab.  (E for in house production.  F for external procurement.)

MRP Group

100

Area in TLB interactive planning where you can set up custom lanes for your work area, an easy way for planners to load specific, frequently used data.

Selection Profile

200

Similar to the SNP Planning Book, however this Planning Book allows for access to TLB (Transportation Load Builder) and the running of Deployment Heuristics

Deployment Planning Book 

200

This is the process of generating planned replenishment orders from the plants to the Distribution Centers

Replenishment Planning

200

Provides deployment details on ATD quantities, unconfirmed purchase requisitions, and STO/PSTO quantities

ZAPO_DEPLOY

200

This horizon refers to the period of time over which deployment takes into account the planned distribution demand. This horizon starts from  today’s date.

Pull Deployment Horizon

200

After executing TLB, doing this will send the PSTO or ESTO to ECC

Refreshing

300

Typically this type of STO is used to support prod-push manufacturing processes & is used for planning purposes only

PSTO

300

In SAP, boxes marked with a check indicate

 Required Entry

300

Reports APO transportation lane data.

ZAPO_TLANE

300

This horizon refers to the period of time over which deployment takes into account the receipts defined in the ATD receipt category group of the location master.

Push Deployment  Horizon

300

When can you make a change to a STO in APO?

Prior to sending to ECC

400

An algorithm that allows SNP to calculate quantities that must be delivered to a location on a time bucket basis in order to match demand and maintain desired service levels

Heuristics

400

This happens if data originating in ECC in maintained in APO only

Data is overwritten during next planning run

400

Product Master Maintenance: Maintain master data (including planning and deployment parameters) for products at locations

/SAPAPO/MAT1

400

The system immediately distributes all supply to the demand locations (ignoring the demand dates specified at the demand locations) to fulfill all demands within the pull deployment horizon.

Push/Pull Distribution

400

Clicking this button will allow you to load data such as APO Transportation lane in order.

Selection window/shuffler/Tulips

500

Plans the supply of finished goods across the entire TreeHouse Foods network and ensures the optimal use of Purchasing, Manufacturing, Distribution, and Transportation in meeting forecasts and actual demand - while considering all constraints in the Supply Chain

SNP

500

Material List Report: A custom report used to view and analyze APO product master data. The report can be sorted, filtered and exported to Excel.  Can also be used to mass change Product Master. This report has download and upload processing with fix production functionality to hole SNP orders static during the SNP Planning run.

ZAPO_MATLIST

500

The system immediately distributes all supply to the demand locations (ignoring the demand dates specified at the demand locations) to fulfill all demands within the pull deployment horizon

Push Distribution

500

After the release of the STO in APO to ECC, doing this can only happen in ECC.

Making changes to the STO