service
definitions
NEC
don'ts
true/flase
100

what are service lateral conductors 

under ground service 

100

what is service drop

overhead electrical lines 

100

NEC ____ provides rules for working space around electrical equipment 

110.26

100

main service disconnect shall not be installed in a 

bathroom

100

cu is short for 

copper 

200

a panel board must not be installed in an  

face up position

200

what does ufer stand for 

concrete-encased grounding electrode

200
_______ states that if 4awg or larger underground circuit conductors enter a cabinet,box enclosure oir raceway, an insulating bushing or equivalent must be used 

300.4 

200

al is short for 

aluminum  

300

its important for the disconnect panel used as service equipment be marked

suitable

300

what is over current

a condition which exists in an electrical circuit when the normal load current is exceeded.

300

when calculating the size of the required service,house hold cooking  equipment demand factors are given in table

220.55

300

SE cable is use for a service  

true 

400

grounding rods must be at least___ ft in length

400

what is  service-drop 

conductors are permitted to be attached to and spported by the service mast 

400

when calculating the size of the required service, household electric clothes dryer demand facters are given in table 

220.54

400

you dont need duct seal for service 

flase 

500

ground clamps used for bounding and grounding must be 

listed for the purpose 

500

an exterior raceway containing service entrance conductors must be 

raintight 

500

the grounding eletrode conductor is sized according to table 

250.66

500

four appliances fastened in place a demand factor of 75%

true 

M
e
n
u