Who is required to provide PPE?
Who is the Employer
What is the minimum PPE required on our jobsites?
Double points if you can also name the other PPE required depending on the hazard
What is hard hat, pants, boots
Safety Glasses, High-Vis, Earplugs/hearing protection, gloves
What is one thing every subcontractor says they need more of?
What is Time?
When should deficiencies be corrected?
What is as soon as they're discovered
How often is a SWPPP Inspection required?
What's one of the many things the Civil engineer never coordinates with the Architect? Multiple Answers will be accepted :)
What is Downspout to Storm connections
But also any other answer is good
When roughing in above the ceiling, which trade gets to go first?
Who is the Mechanical sub - ductwork
How often are fire extinguishers required to be inspected?
What is monthly
What is the #1 reported construction jobsite injury reported to OSHA annually?
What is slips & falls
What is the most borrowed tool on a jobsite?
What is a tapemeasure
Who is responsible for calling 811?
What is whoever is digging (site sub)
For ADA, what is the max reach height AFF for anything on the wall?
What is 48" AFF
What is one thing that is never coordinated between Mechanical/Plumbing and Electrical? Multiple answers accepted
What is equipment electrical requirements
When should you ask the Steel sub to provide anchor bolts?
What is before starting concrete foundations activity.
What is the rule of thumb when using a ladder?
What is maintain 3 points of contact
Ladders should extend how far above the landing surface?
What is 3 feet
Who is responsible for updating the plans in Procore?
Double Points: Who is responsible for ensuring the subcontractors are using the most up-to-date plans on-site?
Who is the Project Manager, APM, or Project Engineer
Who is the Superintendent
How often should you update as-built drawings?
What is every week
What is the maximum stair riser height for commercial buildings according to Florida Building Code?
Double points if you can also name the tread minimum in inches.
What is 7" max riser height
What is 11" minimum tread depth
What takes precedence, the drawings or the specifications?
What does it mean when an activity is on the critical path?
What is the activity has zero days of float
What is 90 dBA
How deep can you dig a trench before you need to install a protective system of some kind?
What is 5 feet
Managing day-to-day field operations safely, on schedule, and to the required quality.
What is 1 year, at substantial completion
What is the allowable running slope for accessible route walking surfaces?
Double points if you can also name the allowable cross slope
What is 1:20 running slope (5%)
1:48 cross slope (2%)
Where do you find the fire-rated walls on the drawings?
What is the Life Safety Plan
What activities cannot commence until the building is dried in? Multiple answers accepted
What is hanging drywall, duct mastic, tile installation, any insulation, any moisture absorbing materials
If you're working more than ____ feet above the ground, OSHA requires you to be protected by a fall protection system of some kind.
What is 6 feet
What is the minimum height of construction site guard rails?
What is 42"
Which trade is usually the first permanent utility installed on a commercial building?
What is Underground Plumbing (sanitary)
Who is responsible for checking that the correct materials are delivered, that they match the submitted products, and are properly stored according to the manufacturer's recommendations?
Who is the Superintendent
For an ADA toilet, the center line shall be ___ minimum to ____ maximum inches from the side wall or partition.
What is 16 to 18
If a subcontractor makes a mistake on their shop drawings, and the Architect/Engineer approves the submittal, who is responsible for the error?
What materials cannot be installed until the building is conditioned? Multiple answers accepted
What is casework, flooring, ceiling tiles, wood doors, any porus material
What is the maximum travel distance to a fire extinguisher on a construction site?
What is 100 feet
According to OSHA, what is the minimum height of toeboards?
How much does one cubic yard of concrete weigh?
What is 4,000 lbs
What is the minimum curing period often specified for concrete?
What is 7 days
What clear space, in inches, is required on the pull side of an ADA front approach outswing door?
Double points if you can also answer the clear space, in inches, required for and ADA inswing door.
What is 18 inches for outswing
What is 12 inches for inswing
What website can you reference for checking the installation requirements for exterior products in FL (roofing, storefront, siding, etc.)?
What is the Florida Product Approvals or NOA
How far ahead should you be scheduling subcontractors?
What is 4-6 weeks