The year Combitech was founded
What is 1982?
This acronym "SP" expands to this (consists of WPs, part of an MR)
What is **Solution Package
"RBS" stands for this
What is a Radio Base Station
MR
What is a Main Requirement
The code-review system where you push changes for review
What is Gerrit
The last name of Combitech's CEO
Öberg
This F-decision marks **Start of Implementation**, once system impact is understood
What is F2
"CAT" in this context expands to this logical architecture layer
What is Common Architecture Tier
OA
What is Opportunity Analysis
The web tool/tracker that holds all the SPs, MRs, and Studies
What is FPT (Feature and Product Tracker)?
Combitech's three core values
What are Respect, Passion & Collaboration
A Main Requirement is made up of these smaller items
What are Solution Packages?
"DCGM" — a collection of logs from all DBI across the complete node — expands to this
What is Data Collection Guideline Mandatory?
What is a Network Design Specification?
The Ericsson document repository you search for formal documents
What is EriDoc
The number of offices located in Sweden
What is 28
This mandatory F-gate means Development Complete — ready for commercial release
What is FG
The package contains logs and other data to be used by Ericsson for analyzing the problem in case of node failure.
What is Ericsson Support Information (ESI)
MUM
What is the MS-RAN Unified Model?
The code-search/browse tool for looking up definitions and references across source
What is OpenGrok
Name the sixth divison
Systems Engineering
Defence & Security Solutions
Speciality Engineering
Cyber Security
Digital & Management
Autonomy & Connectivity
Before F2, these two documents must be approved: cross-class impact, then internal design
What are the CFC (Classify Feature Check) and DC (Design Check)
This file dump is created when a program crashes, containing a stack trace
What is a PMD (Post Mortem Dump)?
NoSA
Node System Analytics
The CI framework for finding BDC/NBC/MBT loops and job verdicts for RAN products
What is Radiator