Tech / Materials / Quality
Waste / Lean / CSR
Elements/ Characteristics / Global
Retrieval
Random
100

is Quality Control reactive or proactive

reactive

100

name the 4 elements of Lean

Pull

One-piece flow

Takt

Zero defects

100

list the elements of operaions

inputs process outputs

100

owners in a private limited company

1-50

100

Which animal has the highest BP

200

'is a computer-based system used to calculate the materials and components needed for production and when they should be ordered' defines

Materials Requirement Planning

200

A CSR strategy for each of IPO

Inputs

  • Using recycled or environmentally friendly raw materials
  • Sourcing from ethical and sustainable suppliers

Processes

  • Reducing waste, water or energy use during production
  • Recycling materials used in operations

Outputs

  • Using recyclable or biodegradable packaging
  • Producing environmentally friendly products or services
200

benefit and limitation of global sourcing of inputs

Benefits of global sourcing of inputs

  • Lower costs from cheaper labour or materials overseas
  • Access to higher quality or specialised inputs
  • Greater variety of suppliers and resources

Limitations of global sourcing of inputs

  • Longer delivery times and shipping delays
  • Exchange rate fluctuations increasing costs
  • Reduced control over overseas suppliers and quality standards
200

name the 4 Drives in 4DT

Learn, Belong, Acquire, Defend

200

Name the city

Barcelona


300

what do APL, MRP, JIT and QA stand for?


Automated Production Line

Materials Requirement Planning

Just in Time

Quality Assurance

300

why is recycle the least optimatl of the 3Rs

requires energy to breakdown / transform materials

300

if a tanigble product is 'homogonous', an intangible service is ...

'individualised'

300

define unlimited liabilty


Unlimited liability is when the owner of a business is personally responsible for all business debts, meaning their personal assets may be used to repay creditors.



300

What breed of dogs does Mr Rhodes have?

Greyhound

400

link forecasting to efficiency

  • Reduces waste by ordering the correct amount of materials
  • Prevents overproduction or stock shortages
  • Improves use of labour and equipment through better scheduling
400

name a contemporary example of one of the 3Rs

many answers possible

Freitag = reuse / reuse

PARCS = reduce / reuse

Qantas = recycle

400

justify if a cafe is a manufacturing or service business

Service:

Tangibility — mainly provides an intangible service experience.

Storability — services cannot be stored.

Resources dominance — relies heavily on labour.

Production / consumption pattern — produced and consumed at the same time.

Customer involvement/contact — high customer interaction.

Consistency of product — service quality can vary.

400

list the forms of termination that can be voluntary

retirement, resignation, redundancy

400

how tall is Uluru (+/- 30m)

314m

500

How could WGS implement one TQM principle

  • Employee involvement - asking teachers for feedback on school processes.
  • Continuous improvement - reviewing student results and feedback regularly.
  • Customer focus - improving programs based on parent and student feedback.
500

what does takt actually mean?!

Takt means the rate of production needed to meet customer demand. It sets the pace workers should produce products so output matches sales without overproduction or delays.



500

difference between overseas manufacture and global outsourcing

  • Overseas manufacturing is when a business produces goods in another country.
  • Global outsourcing is when a business hires another overseas business to complete a task or service on its behalf.
  • OR talk about 'scope' or 'control'
500

define corporate culture & give an example of official corporate culutre at WGS

shared Values Ideas Beliefs and Expectatoins (VIBEs) within a business.

Any policy, slogan, logo, image etc

500

3:48.68 is the world record for which mens, athletics event?

1500m

M
e
n
u