Cost Management
Project Execution
Quality & Safety
Platform/General
Wildcard
100

This is the term for the original agreed-upon project cost before any changes are made

Original Budget

100

This is the term for a formal document sent to a vendor requesting product specifications or samples for approval

Submittal

100

This is the Procore tool used to record when someone gets hurt on a jobsite

Incidents

100

This is the permission level in Procore that allows a subcontractor to view and upload documents but not edit or delete them

Standard

100

 Name the Procore tool where you would go to see everything assigned to you on a project in one place

My Open Items 

200

In Procore, this document is issued to a subcontractor to formalize their scope and price

Commitment/subcontract

200

This is the Procore tool where field teams log and track issues, pre-punchlist items, and non-conformances that need resolution before project closeout

Observations

200

In Procore Q&S, this is the name for a reusable checklist structure an admin builds before it’s deployed to a project

Inspection Template

200

This is the term for the structured hierarchy in Procore that organizes work into phases and tasks

WBS

200

What are the three types system files can our new scheduling tool accept

excel, msp, p6

300

This is the name for the difference between the budgeted amount and the actual cost spent.

Variance

300

In Procore, this status means an RFI has been answered and no further action is needed

Closed

300

In Procore, this is the name of the tool used to digitally document and assign hazards or unsafe conditions spotted during a jobsite walkthrough

Observations

300

This is the term for the Procore feature that allows admins to automate document distribution and approvals across project team members without manual follow-up

Workflows

300

This is the name of the Procore dashboard that gives executives a modified WIP report across all projects

Budget Variance

400

This Procore feature allows you to group costs by phase, trade, or division using a standardized numbering system

Cost Codes

400

In Procore’s Drawings tool, this is the term for a note, cloud, or shape drawn directly on a plan sheet to flag a question or issue

Markup

400

This is the Procore tool used to log attendance, distribute agendas, and capture minutes for jobsite safety huddles and OAC's

Meetings

400

What cloud-based environment/server do we use to store company/project data

AWS

400

This is the specific file type required when uploading drawings into Procore's Drawings tool to get best use of the OCR

Vector PDF

500

What is the name of the tool/feature that allows a user to ask a trade/vendor for updated scope pricing? 

RFQ

500

This is the name of the Procore tool used to formally track when materials, equipment, or documents are sent between parties on a project

Transmittals

500

This is the name of the Procore document used to track labor, equipment, and materials used on a job on a day-by-day basis for cost reimbursement

T&M Ticket

500

What are the two types of communication call that are used in Resource Planning when communicating with assigned resources

Alerts & Messages

500

What website does the weather pull from in the daily log

M
e
n
u