Slump
Pressure Air
Volumetric Air
Sampling
Beams + Cylinders
100

What is the purpose of the slump test?

Measure / gauge workability of concrete sample.

100
What are the dimensions of the tamping rod used in the Air Test? What is the shape of the tip of the rod?

- 16" to 24"

- 5/8" diameter

- Semi-hemispherical tip

100

What type of alcohol is used in this test (typically outside of lab)?

70% Isopropyl Alcohol

100

What should be done if the concrete contains agg. larger than is appropriate for the size of the molds being used? 

Wet Sieving (Screening)

100

What type of strength does cylinders measure? What about beams?

Cylinders = compressive strength

Beams = flexural strength

200

What are the dimensions of the slump cone?

4" top diameter, 8" bottom diameter, 12" tall
200

What are the valves on the side of the air meter called, where water is added during the test?

Petcock!

200

What is this test method required for?

Lightweight concrete mixtures!

200

What must occur before a sample of concrete can be taken from a revolving drum mixer?

All water and admixtures must be added to the mixer!

200

What are the 4 standard sizes of cylinder molds?

2x4, 3x6, 4x8 and 6x12 (all in inches)

300

How many times do you hit the cone with the mallet after rodding each layer?

NONE!!! PLEASE DO NOT TAP THE MALLET ON THIS TEST!!!

300

How much should you overfill the bowl by when filling the final layer?

1/8" above the bowl before striking off

300

What are the minimum dimensions of the strike off bar?

3/4" x 1/8" x 12" 

300

What action is required after the individual concrete samples have been transported to the place where tests are to be performed?

Combine and remix the samples with a shovel!

300

What is the maximum aggregate size allowed for these tests?

2 in. 

400

You lift the slump cone and your concrete member falls over to one side; what should you do as a student performing the test?

The test is a shear result, and thus is invalid! You should inform the examiner and let them know why the test is an invalid result.

400

How often should the air meter equipment be calibrated?

Every 3 months! (Allegedly...)

400

You finish the test and discharge of the sample from the pot. The examiner checks the pot and there is residue stuck to the bottom of the pot. What should you do?

Explain to the examiner that the test would be invalid due to the pot not appearing to be "washed".


Hopefully y'all have a chill examiner, and you won't have to repeat the test :)

400

Describe the procedure for collecting a sample from a paving mixer. (HINT: 2 steps)

- Discharge the contents of the paving mixer

- Obtain samples from at least five different portions of the pile

400

I have a slump of 1 in. for my concrete sample... can I rod my sample, or do I need to vibrate it only?

You can choose to rod OR vibrate the sample!

500

You are filling the final layer of the slump cone, and you overfill the top of the cone. After performing 7 rods, the concrete has dropped underneath the top of the cone. What are your next steps? 

- Place more concrete on top of the cone

- Finish rodding the 25 (18 additional rods ONLY)

- Use the rod to clear all excess concrete from the top of the cone

500

What can occur if the concrete sample in the bowl is vibrated for too long? (HINT: one word I am looking for...)

Frothing!!!

500

What should you do if more than 2.5 pints of isopropyl alcohol are added to the test?

Apply a correction factor using the table in the books
500

Start molding specimens for strength tests within how many minutes after fabricating the composite sample? 

15 min

500

How many rods should a standard beam get per layer??? (what number is it exactly)

63 rods per layer (how do we find this?)