SECTION 1
What are the first 5 sections of the 11-140-5?
Introduction, Description, Configuration, BIT/Test, and Common Procedures.
A MK.82/BLU-111 is filled with how many pounds of explosive charge?
192 Pounds
How much thermal coating can a bomb have missing onboard a ship?
Bombs with more than 56 square inches or one area greater than 15 square inches of thermal coating missing shall not be used afloat.
The FZU-32B/B turbine generator starts its function at air speeds greater than what?
133 knots.
GBU-32's utilize which KMU kit?
KMU-559
What is a warning?
An operating procedure or practice which, if not correctly followed, could result in personal injury or loss of life.
A MK.83/BLU-110 is filled with how many pounds of explosive charge?
445 Pounds
What is the shelf life of a BSU-85?
20 Years
How many pounds of explosive filler does the BLU-126 have?
27 pounds
The DSU-33 Sensor will not fit flush with the fuze well. Approximately how much space between the sensor and bomb fuze well is acceptable?
1/4 inch
What is a caution?
An operating procedure or practice which, if not strictly observed, could result in damage to, or destruction of, equipment.
A MK.84/BLU-117 is filled with how many pounds of explosive charge?
945 Pounds
When using MK 122 switch in conjunction with MK 84 bomb bodies, what mods must be used?
MK 84 MOD 6 or 7
What explosive filler is used inside a BLU-129?
MNX-1282
KMU-559 tail assemblies weigh approximately how many pounds?
84 pounds.
What is a note?
An operating procedure or condition which it is essential to highlight.
What sub caliber practice bombs does the navy use?
MK.76, BDU-48, and BDU-33
A reaction of varying intensity which occurs when an energetic material (propellant/explosive) is exposed to intense heat for a significant period of time is called what?
Cook-off
The GBU-12F/B is a dual mode weapon that incorporates GPS guidance using the _____ vice the MAU-169, MAU-209 or WCU-10.
WGU-53/B
FZU-48 initiators dropped in excess of what distance while out of container shall be considered unserviceable?
One foot
What does the term ensure mean?
Used in prefacing inspection steps or procedures and meaning that if the criteria is NOT met, the technician should do all in his power to fix the discrepancy.
What adaptor is required to install signal cartridges MK.4 and CXU-3 in the tail fuze well of an inert bomb?
MK.89 MOD 0
In the event of a conflict between the NA 01-1A-75 and procedures found in this publication on cleaning and corrosion removal procedures, what procedures take precedence?
NA-01-1A-75 shall take precedence.
How much does a BDU-59 weigh?
89 lbs.
How many setscrews does a KMU-559 have?
Eight setscrews
What does the term verify mean?
Used in prefacing inspection steps or procedures and meaning that if the criteria is NOT met, reject item.
The DSU-33 uses what kind of radar?
Doppler
What is the drop criteria for a DSU-33 in the container and out of container?
3 feet in container. 6 inches out of container.
The ADU-892/E computer test set adapter is used in conjunction with the CMBRE to test what?
The Laser portion of the WGU-53/B Guidance Kit.
What does LDAT stand for?
LOW DRAG ARM TIME
What is a NAR?
Notices of Ammunition Reclassification (NAR) are issued initially by message and inserted in NAVSUP P-801 at each change or revision.
What bomb fin provides the aircraft with a capability of retarded (high-drag) low altitude, high speed delivery or unretarded (low-drag) bomb delivery.
BSU-86 Fin.
What is the drop criteria for a CXU-3A/B in the container and out of container?
18 inches in container. Any distance out of container.
Adding a DSU-38 to a GBU-38 creates what bomb?
GBU-54
What will happen if the LDAT switch is set to the “X” position when the FZU-48 is utilized?
The weapon will dud.
What is the Navy Transportation Safety Handbook for Hazardous Materials publication?
NAVSEA OP 2165 (Vol. 1)
How many mounting holes does the MHU-191 munitions transporter have?
52 mounting holes
What is the service life of a MK 77 after being filled with fuel?
6 Months
The BLU-117C/B utilizes what explosive filler?
AFX-795
Can one person install a fuze when building the GBU-32?
Yes, however two persons are preferred for ease and speed of installation.
What is the Aircraft General Purpose Bombs, Fire Bombs, Practice Bombs and Components publication?
NAVAIR-11-5A-17
What is designed to provide better penetration of hard targets without the likelihood of the nose plug shearing during oblique impact?
MXU-735/B
How is service life calculated?
Service life shall be calculated from the date the component is removed from the container and installed in All-Up-Round (AUR).
The DSU-33 has a Height of Burst (HOB) of how many feet?
20 feet nominal
When installing the power cable on the DSU-33 sensor can you use pliers or any other tools on the shell?
No, The use of tools could damage internal parts which may cause sensor to malfunction.
What is the OPNAVINST 8000.16D?
Naval Ordnance Management Policy (NOMP)
What suspension lugs are used with the MK 84 Series and BLU-117 general purpose bombs?
MK 3 MOD 0
When installing a M-70 series cable, a minimum of how many turns should be made in both legs of the cable?
A minimum of 6 turns is required and should be made in both legs of the cable, as close to the charging well plug end junction of both cable legs as possible.
The Mk.4 produces heat exceeding how many degrees Fahrenheit?
2,500
The arrow on top of the FZU must be pointed which in what direction?
Towards the nose of the bomb.