General
GET IT BACK
ADI
Resource Management
Assessment
100
Procedures, Controls, Process Measures, Interfaces, Responsibility, Authority
What are Safety Attributes?
100
The Inspector
Who is the first person responsible for quality data.
100
ADI
What is Assessment Determination and Implementation?
100
Reports to a frontline manager above the PI, must be qualified as an air carrier inspector, and should be assigned to no more than four CMTs
Who is a Data Evaluation Program Manager (DEPM)?
100
The air carrier may partner with the FAA to complete. When collaborating, air carrier personnel are active participants and working members
What is a Design Assessment?
200
Design Assessment Performance Assessment Risk Management
What are the 3 Major Functions of ATOS?
200
Master Record *BONUS*
Where the inspector saves EPI or SAI activity after completing. *BONUS*
200
FAA Compliance and Enforcement Program
What is FAA Order 2150.3?
200
Notifies the PI or CPM that work remains unassigned.
Who are the Frontline Manager
200
Questions that are based on regulatory requirements
What is a Specific Regulatory Requirement?
300
CATT
Corrective Action Tracking Tool
300
Saves SAI to master record after team is finish.
Who is the Team Coordinator?
300
Defects in the design of the air carrier’s processes (e.g., missing procedures, poor controls, lack of attention to interfaces), patterns of repeated noncompliance with procedures, or significant changes in the operating environment
What are Systemic hazards?
300
ORA *Bonus*
Who is assigned to each CMT and provides analytical support?
300
Are included with questions for inspector reference only and are not expected to respond to each. Aid the inspector in determining if a certificate holder’s written policies, procedures, instructions, and information are adequate
What are Job Task Items?
400
Air Carrier Assessment Tool (ACAT)
What is a tool that uses risk indicators to look for conditions that may be creating hazards in the air carrier’s systems?
400
International Civil Aviation Organization identifer.
What is the Departure and Arrival points?
400
SAT
What is System Analysis Team (SAT)?
400
Provide detailed instructions to assist the manager or frontline manager in identifying appropriate individuals to assign to SAIs and EPIs
What are PI Instructions?
400
Are not a substitute for the planned inspections and are not intended for routine use
What is a Dynamic Observation Report (DOR)?
500
AFS-40
Who conduct audits compliance with ATOS policy and procedures.
500
N/A
What entered when a question does not apply to the air carrier operation?
500
When the air carrier’s or applicant’s system performance is not affirmed due to a systemic problem, the PI must take action
When is System Reconfiguration Required?
500
This position s a leadership role that should be assigned to an experienced inspector with a solid knowledge of the air carrier and should be based near the location where most SAI activities will take place
What is a SAI Team Coordinator?
500
Can be an individual, department, committee, or position
Who is a person?
M
e
n
u