SE CUSTODY AND MAINTENANCE HISTORY RECORD
OPNAV 4790/51
DISTANCE TO HOLD SALUTE UNTIL OFFICER HAS PASSED IF NOT RETURNED.
SIX PACES.
WHAT ARE THE 4 TYPES OF TD'S?
FORMAL CHANGES, INTERIM CHANGE, BULLETIN, RAMEC (REF 00-25-300, 25/172)
WHERE ARE AIRCRAFT LOGBOOKS & ASSOCIATED RECORDS PHYSICALLY LOCATED?
MAINTENANCE CONTROL
WHAT IS THE FORM NUMBER FOR A VIDS/MAF?
OPNAV 4790/60
THE REQUIREMENTS FOR CREATING A OPNAV 4790/51.
TD'S AND PM'S!
WHAT DOES ORM STAND FOR?
OPERATIONAL RISK MANAGEMENT
TECHNICAL DIRECTIVE CATEGORIES.
IMMEDIATE ACTION, URGENT ACTION, ROUTINE ACTION, RECORD PURPOSES
ALL LOGBOOK/RECORD ENTRIES SHALL BE MADE UNDER THE DIRECTION OF _______.
MAINTENANCE OFFICER
WHAT IS THE PURPOSE OF THE SE CUSTODY AND MAINTENANCE HISTORY RECORD(OPNAV 4790/51)?
TO RECORD ACCEPTANCE INFORMATION, CUSTODY AND TRANSFER, REWORK, PRES AND DEPRES, TDS, AND ANY OTHER MISCELLANEOUS HISTORY REQUIRED TO ACCOMPANY THE SE THROUGHT ITS SERVICE LIFE.
SECTION III&IV OF THE OPNAV 4790/51.
WHAT IS PRESERVATION/DEPRESERVATION AND TECHNICAL DIRECTIVES?
ORM PROCESS CYCLE.
IDENTIFY THE HAZARDS, ASSESS THE HAZARDS, MAKE RISK DECISIONS, IMPLEMENT CONTROLS, SUPERVISE
TD CODE FOR AFC.
(50) AIRFRAME CHANGE
WHAT IS THE AUTHORIZED DEVIATION FOR INSPECTION THAT ARE BASED ON CALENDAR DAYS?
+/- 3 DAYS
WHAT IS THE PURPOSE OF THE AIRCRAFT WEIGHT AND BALANCE PROGRAM?
TO PROVIDE AVIATION ACTIVITIES WITH A STANDARD SYSTEM OF WEIGHT AND BALANCE CONTROL FOR AIRCRAFT.
WHAT IS THE MAX NUMBER OF OPNAV 4790/51 CARDS ALLOWED TO BE IN EACH RECORD?
WHAT IS 2? THE CURRENT/WORKING COPY AND THE LAST COMPLETED COPY OF THE SE CUSTODY AND MAINTENANCE WILL BE RETAINED IN MAINTENANCE CONTROL, OR PRODUCTION CONTROL.
HOW CAN YOU DISTINGUISH BETWEEN A MANUAL, FORM OR INSTRUCTION JUST BY LOOKING AT IT.
- MANUAL, / FORMS, . INSTRUCTIONS
WHAT IS THE TDC FOR A AFB.
(74) AIRFRAME BULLETIN
TRUE/FALSE DEPOT LEVEL FACILITIES PERFORMING STANDARD OR SPECIAL REWORK ON AIRCRAFT ARE REQUIRED TO ACCOMPLISH THE NEXT PHASE WHILE THE AIRCRAFT IS LOCATED AT THE D-LEVEL FACILITY.
FALSE. THE NEXT PHASE IS PERFORMED BY D-LEVEL ONLY WHEN REQUESTED BY REPORTING CUSTODIAN AND APPROVED BY ACC/TYCOM AND COMNAVAIRSYSCOM.
HOW LONG DO WE KEEP PAPER COPIES OF XRAYS?
WHAT IS CURRENT AND PREVIOUS YEAR.
HOW TO KNOW WHEN EQUIPMENT/SE REQUIRES NDI OR PROOF LOAD?
NAVAIR 17-1-114.1
SECNAVINST 5216.5C
CORRESPONDENCE
Recommended time frames for target completion dates for TDs are:
Immediate Action _ years
Urgent Action _ years
Routine Action _ years
RAMEC _ years
Immediate Action 2 years
Urgent Action 3 years
Routine Action 8 years
RAMEC 5 years
WHAT TYPE OF INSPECTION IS PERFORMED AS A RESULT OF A SPECIFIC OVERLIMIT CONDITION SUCH AS HARD LANDING?
CONDITIONAL
CNAF 4790/113
WHAT IS THE EHR FORM NUMBER.