Quality
Safety
Production
Systems
Rejects
100

Also known as a QIR, it serves as the main method for operators to escalate any processes deviations or abnormalities to the tech team.

What is a Quality Incident Report?

100

Also known as EHS, they are in charge of monitoring and preventing workplace hazards from happening. 

What is Environment, Health, and Safety

100

Also known as an SOP, these documents outline how to safely start up, operate, and turn off equipment.

What is a Standard Operating Procedure?

100

This program is used to monitor key process parameters like coat weight, line speed, seal depth, etc. 

What is SPACE?

100

Reject code for particle(s) in between top pad and sub pad stack.

What is POLY 66?

200

Also known as OOC, this is a violation that shows up on the SPACE Monitor computer when something is run incorrectly.

What is Out of Control?

200

This is the rally point for B7 in the event of a building evacuation. 

What is the B7 front lawn (in front of Bellevue Road)?

200

20,000 pads

What was the target last month?

200

Also known as an MOC, this is used to document and review any changes made to the process.

What is a Management of Change?

200

Reject code for black smudges on the polishing side of the pad that cannot be removed.

What is POLY 40A?

300

Also known as an OCAP, this specific type of SOP details what to do when something deviates from the normal process.

What is an Out of Control Action Plan?

300

This prevents people from entering areas with potentially dangerous or hazardous work occurring. 

What is red tape?

300
This is text on a PO that provides additional instructions for how to run certain material and what die to cut the material with.

What is the BOM text?

300

This program is used to provide training to all employees on safety topics, quality systems, and general work processes.

What is an iLearn?

300

Reject code for any incomplete, excessive, or rough groove. Also applies to Ebara holes. 

What is POLY 73?

400

This is required as part of RTS after maintenance or work done on the floor.

What is Top-Down AND/OR Particle Count?

400

The last cause of an OSHA reportable in the Poly unit.

What is a hearing shift?

400

This customer uses the label validator for their final labels and is a Tier 1+ customer.

Who is Samsung (SAS)?

400

Also known as EDMS, this system is used to store all SOP and process documents in one controlled location for everyone to access.

What is the Electronic Document Management System?

400

Reject code for any scratches or roughness that can be felt by hand on the top pad. 

What is POLY 46?

500

What we apply to pads on the floor that need disposition from the tech team.

What is a hold label?

500

These gloves are used for cutting notches with a non-retracting razor blade. (add blade)

What are Level 5 Cutting Gloves?

500

These are the MRP assignment for Finishing HVM.

What is MRP 10 and 11?

500

Also known as RCS, this team creates modified pads in smaller quantities for customer trials that can later be handed off to HVM. 

What is Rapid Customer Sampling?

500

Reject code for incomplete PSA coverage on surface of pad. 

What is POLY 9?