This moisture system provides 100% protection
What is epoxy system?
This product is best used for minor imperfections and smoothing but is very limited build up.
What is floor patch?
When grinding/polishing concrete, this element of concrete mix design is the key to reaching the desired aesthetic.
What is aggregate?
The CBFI corporate office is located in this east county community of San Diego.
Where is Lakeside?
This Major League Baseball Team is the only one whose team city and team name are both in Spanish.
Who are the San Diego Padres?
Three common issues with installing material when a slab has high RH
What is adhesive breakdown, bubbles, discoloration, and debonding?
What is 1/4" in 10 fee and 1/16" in 12"?
The highest accreditation for a tile sub-contractor.
What is the NTCA Five-Star?
In depth knowledge of standard flooring specs and RFPs, experience in an array of markets, & accurate budgeting during design phase, are a few of these.
What are benefits that CBFI can provide to the Swinerton's pre-construction team?
Octopus have this many hearts
What is three hearts?
High concrete PH causes this
What is the alkalinity attacks the adhesive system which causes adhesive softening and/or failure?
What is self leveling system?
This document shows exactly how the flooring will be laid out and installed.
What is a shop drawing?
Christian Brothers also has a residential division that generates clientele primarily through this retail chain.
What is Costco?
These two US state capitals have the only rhyming names.
What is Boston & Austin?
These common misconceptions about RH moisture testing can lead to potential flooring failures.
This slab was poured 30 years ago, there's no moisture issues!
The test results are high? We will just throw in some dehumidifiers and turn the fans on and we'll be good.
Most flooring does not require a perfect level slab it requires a substrate that is sufficiently
What is flat?
We are lucky we live in Southern California! However, this process is a common obstacle when sequencing resilient flooring installation.
What is acclimation & climate control?
Manufacturers typically require installation environments to have permanent HVAC on, or to remain within 65-85°F for 48-72 hours before, during, & after install.
This unique quality of a labor force sets CBFI apart from a majority of other tile and flooring subcontractors.
What is in-house employees/installation crews?
The all time consecutive win record holder, turned Jeopardy host.
Who is Ken Jennings?
This is the best time to perform mositure testing
What is as close to installation schedule as possible?
The most important step before beginning floor prep
What is evaluating the existing or new substrate conditions- including but not limited to moisture, flatness, cracks, contaminants, and surface condition- to determine the proper preparation method.
Requiring upgraded thin-set mortars and limiting installation abilities, large-format tiles are considered to have an edge above this many inches.
What is 15"?
80% and 95% are the requirements for this quality of thin-set mortar when installing interior and exterior tile.
What is coverage?
There are this many minutes in one day
What is 1440?