Concrete Basics
SCMs
Blended Cements
Cement Hydration
ACI Test
100

What are the BASIC materials needed for concrete?

Cement, water, aggregates, air

100

What does SCM stand for?

Supplementary Cementitious Material

100

How many types of blended cements did we learn about (and what are they)?

4 total - IP, IL, IS, IT

100

How many stages of Cement Hydration are there?

5 total stages!

100

What is the allotted amount of time to perform the Slump Test (ASTM C143)?

2 1/2 Minutes (150 seconds)

200

What is the largest consumption of concrete in the US?

Ready-Mix Concrete

200

What is Fly Ash a biproduct of?

Burning coal in power plants

200

What does the subcategory LH mean?

Low Heat of Hydration

200

What is the name for C4AF?

Tetracalcium Aluminoferrite 

200

What should you ALWAYS do after you perform any ACI test?

Clean equipment thoroughly to ensure no concrete residue is left behind!!!

300

Fill in the blank:

_______ Cement Concrete

Portland (From the island, not the city!)

300
What is the full name for Slag?

Ground Granulated Blast Furnace Slag

300

What are some benefits of Rapid Hardening Cements, how many types are there and what would the applications of it be?

1. High early strength and low setting time

2. Four Types - URH, VRH, MRH, GRH

3. Fast-track paving and road construction

300

What is the principal hydration product?

C-S-H (Calcium Silicate Hydrate)
300

How many times do you have to rod per layer of concrete when performing ASTM C231 (Pressure Air Test)?

25 rods per layer

400

Why do we want a lower w/cm rather than a higher one?

Less shrinkage, more strength and durability!

400

What is the maximum replacement of cement allowed with SCMs?

50 percent!

400

How many grades of Oil-Well Cements are there?

3 Total - Ordinary, moderate sulfate resistance, high sulfate resistance

400

What can cause flash set? (HINT: think of which product is involved)

C3A hydrates too rapidly

400

What is the temperature range for initial curing of beams and cylinders? (less than 6000 psi)

60o F to 80o F

500

What percentage of concrete is aggregateon average?

Roughly 60% to 80%

500

What are the 3 forms that Silica Fume can be supplied?

As produced (fine powder), Slurry, Densified

500

How would you write this out?

"A Tertiary blended cement of 12% Slag and 15% Pozzolan with ASR resistance and low heat of hydration." 

Type IT (P15)(S12)(R)(LH)

500

Explain "False Set" and "Flash Set", and how to fix both of these problems.

Flash set cannot be reversed!
500

You just performed your Rollmeter Air Test (ASTM C173) and you noticed that the air dropped 0.25 percent in between your initial reading and second reading. What do you do?

Record the second reading as the final reading! (Good job you just completed the worst ACI test lol!)