Floor Framing
Miter Saw
Concrete
More Floor Framing/ Concrete
Mas Floor Framing
100

One of a series of parallel framing members used to support floor and ceiling loads and supported, in turn, by beams and girders.

Floor joist

100

Keep hands at least _____ inches away from the rotating saw blade when making a cut.

4 inches

100

What are the two main types of aggregates that are used in concrete?

Sand and gravel

100

What type of water should you use when mixing concrete?

Water that is good enough to drink.

100

A foundation is _______.

Supporting portion of a structure below the first floor construction, including the footings.

200

Boards or panels laid directly on floor joists and over which finish floor is laid.

Subfloor

200

Where should the saw blade be aligned when making a cut with the motorized miter saw?

Waste side

200

What percent of concrete do aggregates occupy?

60%-80%


200

What type of admixture is useful for concrete that is placed during hot weather?

Retarding admixtures


200

A beam or girder is _________.

Any large horizontal piece of timber, precast concrete, iron, or other material used to support concentrated loads at particular points along its length.

300

Lowest member of structure's frame; rests horizontally on foundation and supports floor joists.

Sill plate

300

How should the saw blade be moved throughout the stock when making a cut with a motorized miter saw that has a sliding arm?

Pull out, push down, and then push forward.

300

What are the four main ingredients of concrete?

Portland cement, gravel, sand and water.


300

Type III Portland Cement is ______________.

Very finely ground, making it useful for cold weather jobs and produces concrete that gains strength very rapidly.


300

The definition of span is ______.

Distance between structural supports such as walls, columns, piers, beams, or girders.

400

Metal stirrup secured to face of structural member to support and align ends of joist flush with member.

Joist hanger

400

How can the miter saw operator prevent the blade from binding when cutting warped, bowed, or long stock?

Clamp the stock to the table

400

What is the formula to calculate the amount  of concrete needed in cubic yards?

Length x width x depth / 27


400

The termite shield is _______.

Sheet metal placed on foundation wall under sill to prevent passage of termites into structure

400

On our home build, the 44 foot LVL is the ________ joist.

Rim Joist


500

Wood or metal pieces fitted in pairs from bottom of one floor joist to top of adjacent joists, and crossed to distribute floor load; solid stock of same size material as joists may be used.

Bridging

500

What personal protection equipment should be worn by a motorized miter saw operator?

Hearing protection, eye protection, and a dust mask.

500

Type 1 Portland Cement is ____________.

General purpose and the most common type.

500

The spacing of the floor joists for the home build is _____________.

16 inches on center

500

On our home build, the 13 foot long LVL is the _____ joist.

End joist