Clearances
Utilities
Right-of-way
Environmental
100

What document demonstrates that a Chapter has formally approved or supported a road project?

Chapter Resolution

100

Which utility provider is commonly associated with water and electrical infrastructure on the Navajo Nation?

NTUA

100

What does ROW stand for?

Right-of-Way

100

What does EA stand for?

Environmental Assessment

200

A road project requires removing trees within the construction limits. What permit should the team investigate?

Forestry Permit

200

A road improvement project conflicts with fiber-optic infrastructure. Which CURE utility category should be checked?

Telecommunications

200

What does TAA stand for?

Tribal Access Authorization

200

What does BRCF stand for?

Biological Resources Clearance Form

300

Before geotechnical crews begin drilling boreholes, what clearance document may be required?

Drilling Permit

300

What are the five utility categories listed in the CURE checklist?

Water, Sewer, Electric, Telecommunications, Gas

300

What does TCE stand for?

Temporary Construction Easement

300

What does CRCF stand for?

Cultural Resources Clearance Form

400

A proposed roadway crosses an area used by livestock permittees. What clearance item should be reviewed?

Grazing Leases

400

A waterline conflicts with a proposed drainage structure. What should the project team document?

The utility conflict, provider coordination, and proposed resolution or relocation

400

A proposed road improvement affects an individually allotted parcel. Which CURE ROW category should the team review?

Allotments

400

What environmental review category is commonly abbreviated CatEx?

Categorical Exclusion

500

Name three types of land-use or agency clearances identified in the CURE checklist.

Any three: Grazing Leases, Homesite Leases, Chapter Resolutions, Farm Boards, Forestry Permits, ADOT Permit, or the added Drilling Permits

500

A utility provider identifies a conflict but has not agreed to relocate its facilities. Is utility coordination complete?

No. The conflict remains unresolved and requires follow-up and documentation

500

A bridge project needs temporary construction space beyond its permanent ROW. What documentation should the team investigate?

Temporary Construction Easement documentation, including applicable legal descriptions, plats, and consent or authorization


500

A road project may affect a wash or other waterway. Which two Clean Water Act permitting sections should the project team evaluate?

Sections 401 and 404