How many days after the issuance of the Notice to Proceed does time start?
14 days or when work starts whichever date is earlier
True or False: MRP's are performed quarterly
False
According to procedure 850-070-001-e (Contractor Non-Responsibility for Maintenance Contracts) what is the operations office responsibility if non-responsibility conditions exist for a contractor
Review and document the circumstances and notify the District Maintenance Engineer (DME)
We have 30,092 of this particular characteristic along our District's state roads
Street Lights
True or False: Periodic Maintenance Inspections of Crash Cushions and Guardrails should never be performed within Construction Zones
False: Procedure 850-000-005-e (Maintenance Responsibilities within the Limits of Construction Projects) states that these inspections must still be performed within the limits of the construction projects
When is Gene's first day of Retirement?
January 1 2023
According to procedure 375-000-005-e (Performance Based Maintenance Contracting), how is the Final AMPER Score recorded in PrC calculated?
The Final Score is calculated by averaging all semi-annual AMPER scores after dropping the highest score and the lowest score.
What are the four facility types measured by MRP inspections?
Rural Limited Access, Rural Arterial, Urban Limited Access and Urban Arterial
According to Procedure 850-070-002-c (Contractor Field Performance Rating), how long does the project manager have to complete the Final CFPR
20 business days after all required closeout documents have been received from the Contractor.
How many days does the Contractor have to turn in a completed 21-A?
According to Procedure 375-020-002-I (Maintenance Contract Administration, Inspection, and Reporting) The contractor has 90 Days from the Final Invoice submittal.