Net Metering
Energy Planner
Audit Scheduling
SAP
Conservation Tips
100

Who owns and maintains the solar panels associated with Net Metering?

The customer

100

Which payment plan is not compatible with Energy Planner?

Budget Billing

100
What is the standard floor to ceiling height?

8 - 10 feet

100

How many days in advance can a Move In be completed?

45 days (max.)

100

The recommended thermostat setting for the Summer is at ______.

78 degrees

200

Which tiers require an application fee?

Tiers 2 and 3

200

Which application is used to opt-in a customer for AMI and remove an account from Budget Billing

Fiori - Program Enrollments

200

 How should the first and last names be entered in EECP for audits?

In capital letters.

200

How many months is the suggested security deposit amount for?

2 months average

200

What are simple, free home/lifestyle changes, such as closing blinds to conserve energy called?

Practices

300

Which section of the Net Metering/Battery enrollment, can TMs view uploaded pictures and files?

Documents

300

How is the rate of the Energy Planner based?

The rate of electricity the BP pays is determined by the Energy Planner Level that is active at the time they are using electricity. The levels (Low, Medium, High and Critical) vary based on the time of day and the day of the week.

300

For a WEA audit, where can TMs located the Census Tract number?

The GeoMap

300

Which section of Account Factsheet can a TM review for documents sent out for the account, outside of bills?

Correspondence

300

The recommended water heater setting is optimal at _______.

120 degrees

400

The disconnect switch and the meter should be placed, roughly _____ feet apart.

6

400

What are the name of the Energy Planner contractors?

Air Bud and Harry's Electric

400

What are the 5 appointment times for audits, to be entered into EECP?

8:00

9:30

11:00

1:30

3:00

400

Which workcenter is used to update customer's phone number, email and mailing address?

Customer Communication

400

Customers should limit running pool pumps to _______ hours during the Summer. 

6-8

500

Once the Net Metering application is approved and the meter set order has been created, how many does it have to be set/configured by?

30 days.  Once meter is updated, the Solar team has 10 days to send the Welcome Packet and advise customer of able to turn on solar panels.

500

What is the phone number for EP Maintenance and Technical questions?

813-275-3050

500

For Phone and Virtual audits, which analyst should be scheduled?

Ian Sprawls

500

How many tiers are the Energy and Fuel charges billed at?

2 tiers. 

First tier, up to the first 1,000 kWh

Second tier, above the 1,000 kWh

500

What is the name of the Tampa Electric site tool for customers to use and review conservation tips, practices, and measure?

Online Audit Tool

M
e
n