Operating Conditions
Instrumentation
Start Up
Locations
Safety
100

What is the operating pressure of V310?

200 psi

100

What does TC stand for?

temperature controller

100

For transfer from T-200 to R-300, what pump is turned on?

P-201

100

What skid and floor(s) is V-610 located?

Skid J floors 2+3

100

What is the most common type of work related injury?

Slips trips and falls

200

What is the operating temperature of V-511?

750-800 deg F

200

On a P&ID, what does it mean when an instrument name is contained within a circle AND a square?

The instrument communicates or displays back to the HMI. 

200

Why are E-210-212 turned on AFTER the pump is turned on?

To avoid fouling and to ensure heaters are not damaged from overheating. 

200
What skid is V510-511 located?

Skid K

200

What hand tool causes the most injury in the workplace?

screwdriver

300

What is the discharge pressure of P-201?

~1100 psi

300

What might need to be checked if sight glass level instruments are showing incorrect level?

Ensure top and bottom valves are open. 

300

What is the best location (equipment #) for hold up time on start up? At what location could we hold process liquid for an extended amount of time?

T-200

300

Where is V-101A located related to V-101B? (cardinal direction)

A is east of B
300

What DOT HAZMAT class is MCB?

3 - Flammable

400

What is the supply pressure of nitrogen to the Mott filter skid?

70 psi

400

What is the conservation (relief) vent set for on MCB isotainers V-101A/B?

7.25 psi

400

Why is heat up of vessels not done with steam from the start? (We use heat trace until >400 deg F)

To prevent water condensation

400

What major equipment is P-003 associated with?

BFW tank V-100B

400

What supplement might help prevent heat stress for a person that has worked in a hot environment for >2 hrs?

Electrolyte drink

500

What is the operating temperature of V-400?

775 deg F

500

What are the two types of flow meters used on the Zeton process unit?

1. Coriolis

2. Restriction plate (DP)

500

What is the steam flow rate (lb/hr) to V-400 and R-501 based on?

Steam to feed ratio

500

Where is AC-100 located?

100 bonus pts: what does it do?

OSBL, process water skid

500

How often will functionality safety shower tests occur?

Weekly