A facility serving ferries or passenger vessels certificated to carry more than 150 passengers, other than cruise ships, may designate an area within the facility as this.
What is Public Access areas
An owner or operator intending to build a new facility handling LNG or LHG, or planning new construction to expand, must submit this document
What is Letter of Intent
Each hose must be marked with
what is name or the product or OIL SERVICE, or HAZMAT SERVICE
MAWP
Date of manufacture and date of the latest test
These ports and terminals must have a Certificate of Adequacy
What is oceangoing ships 400GT < carrying oily mixtures, oceangoing ships carrying NLS, Fishing vessels offloading more than 500,000 lbs of fishery products
Any facility owner or operator may apply for what document, of any requirement of this part that the facility owner or operator considers unnecessary in light of the nature or operating conditions of the facility, prior to operating
What is a Waiver
A blank is hereby issued for the handling, storing, stowing, loading, discharging or transporting of dangerous cargo in bulk, portable tanks, containers, or packagings
What is a General Permit
At least how many days prior to transferring LHG or LNG, the owner or operator must submit an Operations Manual and Emergency Manual to the COTP
What is 30 days
Welding or hot work is prohibited during gas freeing operations, within blank feet of bulk cargo operations involving flammable or combustible materials
What is 100 feet
Reception facilities capabel of receiving oily mixtures from oceangoing ships within how many hours after notice by that ship
What is 24 hours
The same person may serve as the FSO for more than one facility provided what?
What is in the same COTP and not more than 50 miles apart.
1.1, 1.2 explosives, ammonium nitrate products, 5.1, 4.3, 2.3, 6.1 and class 7 are what
What is Cargo of Particular Hazard
Warning signs at the marine transfer area must have what text on it
what is Warning, Dangerous Cargo, No Visitors, No Smoking, No Open Lights
Fish and Wildlife and sensitive environments, this section of the plan much identify areas of economic importance and environmental sesnitivity, as identified in what
What is the Area Contingency Plan (ACP)
The FSP is approved by who
Who is the COTP
If a facility conducts cargo operations involving foreign flag vessels, the facility must have what
What is International Shore Connection
The marine transfer area for LNG must have how many portable gas detector capable of measuring 100% of the lower flammable limit of methane
What is at least 2
This part applies to each facility that is capable of transferring oil or hazardous materials, in bulk, to or from a vessel, where the vessel has a total capacity, from a combination of all bulk products carried, of how many barrels
What is 250 Barrels
At MARSEC level 2, a DOS is not to exceed how many days
What is 30 days
Containers packed with dangerous cargo that are vertically stacked must be stacked no more than blank high
What is 4 high
The marine transfer area for LHG must possess a communication system that enables continuous two way voice communication between what two people
Who is PIC aboard the vessel and PIC for the facility
The facility operator of any facility must submit a letter of intent to operate a facility or to conduct mobile facility operations to the COTP not less than how many days before the intended operations.
Whais 60 days