What natural hazard is formed due to energy release in a fault line?
Earthquake
Predication is used to ____________ effect of natural hazard or disaster.
Mitigate
How many step does a mitigation plan have?
3
What is the first step in the engineering mitigation plan?
Identify the need
Which tool is used to predict an earthquake?
seismograph
A ___________ is formed due to an earthquake underwater.
Tsunami
Historical data, _________________, and data monitoring.
Scientific understanding
The community provide temporary shelter.
Response
What a model SHOULD HAVE
Criteria
Seismograph is used to predict earthquake, volcanic eruption, and ____________.
Tsunami
Volcanic eruption and earthquake usually happen in the __________________.
Ring of Fire
Which natural hazard is impossible or unreliable to predict?
Earthquake
Practice drop-cover-hold
Preparation
Must not cost more than 100000AED.
Constraint
Which tool is used to observe and predict hurricane/typhoon?
Satellite
What natural hazard can cause flood?
Mitigation is to
lessen
Which phase/step is the longest to complete?
Recovery
Use a rubric to complete this phase/step.
Evaluate and Choose Solution
technology
A natural hazard can turn into _____________ if damages and deaths is high.
Natural disaster
What do you call time in which tornado is abundant?
Tornado season
What natural hazard can UAE make a mitigation plan on?
Sand storm and flood
Which phase uses criteria and constraints?
Define the Engineering Problem
When data indicate that an earthquake has generated
a tsunami, scientists use __________ to determine where it is likely to strike.
computers