People Involvement
Standardization
Built in Quality
Short Lead Time
Continuous Improvement
100

What training process makes sure a team member is trained and qualified to perform a job safely and correctly?

Job Instruction Training

100

What does WPO stand for?

Workplace Organization

100

What system is used to record and track quality defects?

GSIP

100

What material rotation method uses the oldest parts first?

FIFO

100

Before a team can continuously improve a process, what must be established?

Standardized Work

200

What chart shows which team members are trained on each operation?

Flex Chart

200

This document shows the agreed sequence for performing a job and is used at the station to guide repeatable work.

Standard Operation Sheet

200

A critical fastener red lights on the first attempt, What should you do?

Pull Andon

200

What system replenishes material after it is used?

Pull System

200

A team tries a change for one shift. Which PDCA step compares the result with the original condition?

Check

300

Lake Orion Mission Statement

Built With Precision, Customer Focused, Driven By Pride

300

What pace is based on customer demand?

Takt Time

300

What metric shows how many vehicles were built right the first time?

First Time Quality (FTQ)

300

What process tells you when line-side material is too low or too high?

Min/Max Process

300

A temporary fix removes a symptom, but the same problem returns. What must the team identify and eliminate?

Root Cause

400

A team member respectfully challenges a process that could create a safety or quality issue. Which GM behavior are they demonstrating?

Speak Fearlessly

400

An SOS no longer matches the job after a process change. What should the TL use to get the standard corrected?

Document Change Process

400

What process alerts the team when a defect or abnormal condition needs attention?

Alarm and Escalation

400

What keeps good, suspect, and obsolete material separated?

Material Segregation

400

After finding the root cause, what action helps prevent the problem from returning?

Countermeasure

500

What PI practice trains team members on several jobs so they can cover for an absent teammate?

Job Rotation

500

What pace represents a brisk, business-like performance while meeting quality and safety standards?

ILO 100 Pace

500

What BIQ element verifies the process and part before they move to the next operation?

In-Process Control and Verification

500

What should be examined when parts are waiting between operations?

Material Flow

500

What cycle keeps improvement moving forward?

PDCA

M
e
n
u