100

A topographic survey was done for the project. What company performed it, and in what month and year?

What is PSOMAS, October 2019


100

What is the f'c of the new footing and pedestal at the satellite foundation?

What is 4,000 PSI?

100

What is MSG

Metering Switchgear

100

Name three examples from the energy wheel of hazards posed by a tank of unknown contents being picked by a crane

All but temperature. 

100

The slab elevation of the "Sewer Ejector Room"

110' 4 1/4"

200

The proposed pavement sections are designed for how many years of service life?

What is 40 years?

200

What is the elevation of Level 02 – Low Apron?

What is 120'-9 3/8

200

F3b is a type of light for which location?

Restroom entries

200

What temperature triggers the need for shade to be provided to all crews on site? 

80

200

On Level 2, the Edge of Slab Dimensions for Elevators 10 and 11 are what?



20' 4 1/2 and 11' 7"

300

The Isolation Joint Detail shows what 3/4" material between the concrete

Non-extruded premolded compressible material

300

What beam size is shown at the roof on the Grid S11 moment frame?

What is W27x102

300

Panel NLP1 (E) FIS is what circuit number 

47

300

What is the required rating for protective eyewear, as part of minimum basic PPE? 

ANSI Z87

300

The LAWA Large Equipment Storage Room on level 2 has this wall type

A261

400

What is the minimum depth of the concrete foundation for a Type A bollard? Not the modified

What is 7'-6"?

400

At the typical blockouts in the concrete slab on grade at steel columns, what size and spacing of dowels are required, and what is the minimum total number?

What are #5 dowels at 18" spacing, with 3 minimum per side on 4 sides (12 total minimum)

400

According to the general notes on the Level 01 – Sector 4F lighting plan, where are homeruns not allowed?

Under a toilet or wet area

400

A ladder of what length or greater should be lifted by two people?

12 ft

400

The ceiling type for Hold Room 404 on level 3

MCP-9

500

What rebar size and spacing is required in the slab at passenger boarding bridge areas?

What is #8 bars at 8" O.C. each way?

500

For concrete encasement of a steel column in the rectangle column condition, what are the vertical bars and tie size and spacing?

What are (8) #6 vertical bars with #4 ties at 9" O.C.

500

On the Level 03 – Sector 4F lighting plan, the F4 lighting fixtures to be controlled through what, and which control platform must it be compatible with?

A remote-mounted dimming driver, compatible with the Lutron Ecosystem control platform?


500

What's the number for Dig Alert?

811

500

The Contract Number

LAX9010C05


M