What is the first and last method of immobilization?
Dock lock if available
If not available wheel chocks
What does COA & COC stand for?
Certificate of analysis
Certificate of compliance
the same day of load-in
Who is responsible for an unload?
The person who starts unload.
If going to break, leaving, or going to work on something else ownership needs to be handed over to another person in your department or control room.
Who is contacted for maintenance & capital items that appear damaged?
MRO supervisor (Jen) or Roxanne
Daily Double: What is the max pressure PSI for each unload that has restrictions?
Acetic, caustic, PTF caustic, KOH, Phophoric - 25 psi
Ammonia, FW14, perlite - 20 psi
Sulfuric, PTF sulfuric - 15 psi
If a load of totes comes in unsealed on a trailer, would these be accepted and why.
Yes, each tote would need to be verified it has a seal attached to the lid.
Prior to receiving what documents and information should be verified and accounted for.
Verify COA specifications are correct.
Confirm material is shipped from approved supplier site and the b-code and material description match
Confirm Kosher requirements, if any, are met
The Bill of Lading/packing list is (are) checked for a Beloit P.O. #.
For Bulk Raw Materials, the weight ticket is checked to verify weight of load.
Every tote/pallet must be checked to ensure the COA, BOL, and Tote/Pallet’s lot numbers match.
If the supplier site, Kosher requirements, and COA specifications are not correct, stop and contact QAQC.
What is the exact cost of a single tote?
$200.98
Who is contacted for maintenance & capital items that are damaged if MRO supervisor (or Roxanne) is not available?
Maintenance manager (Ryan McKilips)
What are the bulk delivery drivers verifying and will not do per their sign off prior to unloading?
I have verified tanker lid has been properly vented.
I will monitor the unload at all times & will stop it immediately if there are any safety concerns, overflows, leaks, etc.
I am aware of nearest safety shower location I will NOT climb on top of the trailer without proper fall protection
I will NOT operate IFF equipment including block valves, chocks, stop sign, ect. except for emergencies.
I understand IFF Beloit PPE and safety requirements and agree to follow them
For non-bulk deliveries what is looked for when inspecting a trailer?
Trailer is clean, free of debris, and contains NO materials which may be a hazard to product (odor, spills, broken glass, pest, etc.)
When putting non bulk materials away how do we ensure the oldest material will be used first and how do we do this?
FEFO
By rotating stock, placing oldest material in the front to pull from.
Month and year stickers placed on each pallet
Date of production is used - found on COA
If no date of production the receiving date is used
What is the exact cost of a euro pallet?
$53.86
Once docked and opened up what should be reviewed & verified before unloading with forklift?
Delivery does not exceed weight rating for forklift.
What must be done if the dock lock will not engage?
A variance will be needed. Dock lock will be bypassed, and the delivery driver must be pulled from their cab and escorted until loading/unloading is complete.
Only authorized individuals can bypass the dock lock.
For bulk deliveries what is inspected per ETQ #33090?
What also needs to be verified with this?
Unload hoses inspected per EtQ #33090 and connected to correct intake line
How many numbers fit in SAP when entering a LOT number?
What do we use if over this amount and why?
10 digits
Use last 10 digits if more than 10, this is done because the last numbers change while the first ten could remain the same as other lots
Name 3 ways to identify leaks.
Line walks for leaks
Sump density alarms
PPM alarms
If item is felt to be unsecure what can be used to secure?
tie down straps, shrink wrap, or banding wire
The removal of a truck's restraining equipment shall transpire only after all _____ has been completed per Semi, Truck, and Van Immobilization Controls.
work in, on, or around the truck
For non-bulk deliveries what are the materials inspected for?
Incoming materials are not damaged, defective or have any foreign materials present on packaging.
What must be done and considered if unloading an allergen material?
Place an Allergen sticker on any pallets that require it, refer to the EtQ# 33069 Allergen Control Program. Any pallet containing an Allergen may not be stored above any other raw material.
Place an HPC sticker for all allergens and tech grade materials.
What is the estimated cost to install mag meter on dextrose unload line?
$6 - $9k for piping and electrical costs
Driver will have to stop at guard shack to drop off his or her guest badge, safety glasses, hard hat, or any other items provided at the time of arrival to the Beloit Site.