INSTALLATION ORDER
MEASURE IT
SIGN SPACING
PLAN CALCULATIONS
FINAL INSPECTION
100

This is normally the first TTC device installed.

What is The first advance warning sign, typically Road Work Ahead?

100

This point should be located first before measuring the setup.

What is The beginning of the work space or critical closure point shown by the plan?

100

This is X spacing for signs for a 35 mph urban arterial roadway.

What is 350 feet?

100

At 25 mph with a 10-foot lane, the merging taper has this length.

What is 105 feet?

100

These features should be checked before traffic enters the new pattern.

What is Device placement, sign visibility, taper alignment, and clear travel path?

200

TTC devices are installed in this direction relative to traffic flow.

What is With the flow of traffic?

200

This table provides the needed buffer distance.

What is The stopping sight distance table?

200

This is X spacing for signs for a 40 mph rural roadway.

What is 350 feet?

200

Using a 105-foot L value, the rounded shifting taper has this length.

What is 55 feet?

200

These safety features must remain open and unobstructed around a flagger.

What is The escape route and required sight distance?

300

A TTC zone is normally removed in this direction relative to traffic flow.

What is Against the flow of traffic?

300

At 35 mph, this stopping sight distance and buffer are used.

What is 250 feet?

300

This is X spacing for signs for a 50 mph rural roadway.

What is 500 feet?

300

At 25 mph, tangent devices may be spaced no farther apart than this distance.

What is 40 feet?

300

Nonapplicable signs require this action during teardown.

What is cover or remove them promptly?

400

This explains why signs installed before the work area is occupied.

What is to warn road users before workers enter the area?

400

At 45 mph, a flagger must be visible from at least this distance.

What is 360 feet?

400

This is X spacing for signs for a 60 mph rural highway.

What is 500 feet?

400

This number of flaggers applies to the five-lane intersection plan on the exam require.

What is Three?

400

This is the reason removal proceed against traffic flow.

What is Workers remove downstream devices while advance warnings remain in place as long as needed?

500

Workers must verify this condition as installation progresses.

What is that each device remains visible and properly placed?

500

These three roadway facts are needed for many taper calculations.

What are Posted or operating speed, lane width, and the type of taper?

500

This is X spacing for signs for a 70 mph freeway.

What is 1,000 feet?

500

During the shown flagging operation, the intersection signal requires this setting.

What is set it to all-red flash or turn it off?

500

What is Workers remove downstream devices while advance warnings remain in place as long as needed?

Who is the responsible supervisor or qualified traffic-control authority?