5S
Quality
ISUZU History
IM
Enter ISUZU Products
Acronyms
100

How many Prohibited Matters are there?

5 (Five)

100

What is important when producing trucks?

Follow the work standards and ship the truck only after ensuring proper quality.

100

What did Isuzu produce in the past besides trucks?

Passenger cars

100

Isuzu delivers many kinds of products

 to meet customers’ various needs. What are they?

Light Duty, Medium Duty and Heavy Duty

100

What type of brake system does the F-Series use?

Air brake system

100

What are the 4M's?

Man, Machine, Material and Method

200

How many Actions to Ensure Safety are there?

10

200

Who is responsible for building quality into the product?

Everyone involved in making the product

200

When was Isuzu Motors Limited founded?

1937

200

What plant is Isuzu's mother plant?

Fujisawa

200

What was a popular Isuzu product that everyone drove in the 90's?

A- Trooper

B- Amigo

C- Rodeo


C- Rodeo

200

State the 5S's in order.

Sort 

 Set in order

Shine

Standardize

Sustain

300

What is the purpose of Radio Taiso?

To get our bodies prepared for the workday.

300

During bolt tightening, the tool stopped rotating, but the bolt/nut is not fully seated against the part. What should you do?

A- Leave it as is

B- Force-tighten it until it is fully seated. 

C- Replace the bolt and nut with new ones and tighten them again. 

C-Replace the bolt and nut with new ones and tighten them again.

300

What is the name “Isuzu” derived from?

River

300

Our products come in 2,500 types as a result

of a great many combinations of cabs, frames,

 engine models and drive types.

We regard delivering such diversified products to meet customers’ needs as the 

“Truck manufacturer’s mission”

300

A vehicle that was previously judged NG has been repaired. What should you do next? 

A- Ship the vehicle because the repair is complete. 

B- Perform the required re-inspection and verification of the repaired area. 

C- It is OK if the operator who performed the repair checks it. 

B- Perform the required re-inspection and verification of the repaired area.

300

Does anyone know the 3M's used when conducting kaizen's?

1- Muda (Waste)

2- Mura (Unevenness)

3- Muri (Overburden)


400

This 5S step focuses on creating consistent procedures, visual controls, labels, and standards so that the first three S's are maintained the same way by everyone.

Standardize

400

You find a nonconforming part what is you first step?

A- Since you are within TAKT time fix it and keep working.

B- Stop the line and add defect in Ignition.

C- Let it go and notify your Tech Lead later.

B- Stop the line and add defect in Ignition.

400

Who is the Plant Manager?

Wayne Smith

400

IM Philosophy: What is the absolute difference between passenger Car Maker?

”Our Product is for Professionals”

400

Which is a critical component? 

A- Wiring Harness

B- Suspension

C- Battery

B- Suspension

400

What was and addition that was added to the 4M'S?

Mother nature

500

What is one of the main reason tools should be clearly labeled and assigned a specific location?

Prevent Tools from being misplaced, reduce search time, quickly identify missing items, and help maintain a safe and efficient work area.

500

Why do we conduct static and dynamic audits?



Copilot said: 

In a manufacturing and quality environment, static and dynamic audits are conducted to verify compliance, confirm process effectiveness, and ensure product quality.


500

What are the 4 pillars priorities of IM?

SQDC

S- Safety

Q- Quality

D- Delivery

C- Cost

500

What are the IM Steps “Make with Standards”  Step Zero? How many are there?

There are three (3) 

1- Don’t  Pass  Defects 

2- Don’t  Make Defects 

3- Can not make Defects 

500

You need to hand over the work to another operator before the task is complete. What is the most important thing to do?

Clearly communicate what has been completed and what remains to be done.

500

What does PDCA mean?

Plan

Do 

Check 

Act

M
e
n
u