How does an RDC Associate identify boxes that need to be cut open in Fluid (Be specific from RF Gun)
when the scan quantity is greater than the standard pack quantity.
When building pallets or walls, these products must always be kept with arrows up or caps up, even if it impacts stacking.
What are liquids
When labeling a new PTS pallet, the oLPN should be placed on this side of the pallet.
What is the side facing the direction of travel?
Picking up used pallets, carts, and stack racks; loading bad wood trailers; distributing good pallets throughout the building; and traveling between pickup and drop-off locations.
what is pallet stage
I am loaded and secured to the trailer with an E-Strap everytime
What is a butcher block
The first option when MHE'ing this freight across the warehouse is to build it into current OB wall
What is direct loadable freight
What are the three main types of offload categories?
Offload Pallet (OFFLDPLT), Offload Clamp (OFFLDCLMP), and Offload Hand (OFFLDHAND)
In wall building, this percentage of the wall's cube should consist of palletized freight
What is 75%
These are KVIs of what function Assist/Team Lift, Scan shipping label, Acquire pallet, Handle carton, Apply shipping label, Scan header label, Move pallet Mount/Dismount MHE, Check pallet, Clean as you go, Empty pallet drop, Match LPNs, Pre-scan, Remove shrink wrap/tape, Stack-downstack pallets
What in Anchor
When will an ASN that starts receiving on Sunday–Thursday before 10:00 PM Auto-Verify?
10:00 PM the following day.
outbound loaders should stack enough freight in the lane to average this many LPNs per trip into the trailer
2.0 oLPNs per trip
45 puts per trip or 6 SKUs
Fully Utilized BP Rack
This functionality gives receiving associates credit for tasks completed on a trailer and is requested once at the start of each new inbound trailer.
What is Receiving Transition?
This quality check helps leaders identify gaps in a wall and detect phantom walls by physically testing the wall's sturdiness.
What is a push test
Before the receive-to-put process begins, all BP SKU pallets are moved to the BP accumulation area and need what placed on them
what is an ASN label