Operations Practices
All Things Liquid
Just Paperwork
Show Me The Money
It's All Over
100

Part of daily operations that reduces odors and vectors.

What is daily cover? (or initial cover)

100

Liquid that emerges from garbage.

What is leachate?

100

Lines on a map that connect points of equal elevation.

What are contour lines?

100

Question: The amount of the state surcharge fee.

What is $1.25 per ton?

100

The length of the post-closure period for Class I.

What is 30 years?

200

Think of it as the contract between the landfill owner and TDEC.

What is the Permit?

200

These are two factors that contribute to increased erosion rates.

What are rainfall, steep slopes, lack of vegetation and temperature changes?

200

The phrase in the regs that describes when litter must be picked up.

What is "in a timely manner"?

200

These costs make up the biggest part of a landfill annual budget.

What are operational costs?

200

The most common use for a closed landfill.

What is a park or recreational area?

300

The operator is required to document the construction/installation of this component.

What is the liner?

300

An inch of rain on an acre of land will equal about this much water.

What is 27,000 gallons?

300

You must have one of these type people certify your construction design plans.

Who is a Registered Professional Engineer (PE)?

300

It is $400 for 3 days plus a test.

What is the cost of this course?

300

Amount of advance notice you must give TDEC before closing a landfill.

What is 60 days?

400

Term for the type of fill procedure that was used many years ago in TN.

What is "trench fill"?

400

This measurement tells you whether a liquid is an acid or a base.

What is pH?

400

Special Waste approvals must be recertified after this many years.

What is 3 years

400

Typically it will cost between $0.50 and $1.00 per square foot installed.

What is a (60 mil HDPE) liner?

400

It must be at least 12 inches.

What is vegetation layer ( topsoil) depth on final cap?

500

Intermediate cover must be applied at a landfill after this many days.

What is 30 days

500

The physical process that causes water to collect in an active landfill gas system.

What is condensation?

500

Where required records must be kept for possible inspection.

What is at the landfill?

500

The maximum TDEC Annual Maintenance Fee for a Class I Landfill

What is $15,000 dollars

500

Warm season grasses are one choice for this.

What is final cover vegetation?

M
e
n
u