What is the AFI for Deployment Planning and Execution
10-403
What is the AFI for Support Agreement, BAS&E and WRM
Support Agreement 25-201
WRM 25-101
BAS&E 10-404
What UTCs does 2G Fall under (our office)
XFHB*
What are the 2 Primary Readiness Reporting Tool our Office uses
DRRS
DCAPES
What subsystem in LOGMOD can be use to export LOGDET information
LOGFOR
What does the DPWG stand for
How many times are they required to meet
Who Chairs the DPWG
Deployment Process Working Group
Annually
IDO
Who are the 5 approval authority for Support agreement prior the Wing CC signature. "Big 5"
Manpower
FM
CES
SFS
Judge Advocate
What AFI does UTC management fall under
10-406
What AFI Does DRRS fall under
10-201
How many months is UDM position required for
24 months
Give 6 out of the 10 mandatory Members DPWG
Deployment Process working Group
2.6.4. Mandatory members:
Unit Deployment Managers (UDM)
Deployment and Distribution Flight
Plans and Integration Section
Air Terminal Section
Readiness and Plans Section
Manpower and Personnel Flight
Wing Plans
Aerial Port Squadron
Medical or Public Health representative.
Contracting Squadron representative.
What is a FDM in regards to BSP and what is their primary responsibility
Functional Data Manager
The functional data manager prepares and manages a specific functionally oriented or designated BSPchapter and its associated data
How often does a UTC have to be reviewed by the Pilot Unit
Biennial
What is the Readiness Reporting period for DRRS
1-15th
What system is used to generate a Load Planning Data
ICODEs
What does IDP stand for.
How often does have to be review.
Name one event when the IDP needs be revise out of cycle (each correct answer is 100)
Installation Deployment Plan
Once every 4 years
- Activation of a new unit with a deployment commitment.
- A major change in manpower or equipment authorizations.
- A unit move or mission design system change by a tenant or subordinate unit.
- Receipt of newly published deployment guidance or changes from AF/A4L
- A significant change to the installation’s deployment processes or procedures.
What does the ISAC stand for and what is it?
Installation Support Agreement Catalog
Contains a consolidated list of the installation’s core support activities provided under the Functional Communities and Installation Support Categories and corresponding level of support for each activity.
What is a Pilot Unit and Non Pilot Unit
Pilot Unit - A unit responsible for developing and maintaining assigned UTCs. Appointed in writing by MRA FAMs using the unit designator.
Non Pilot Unit - Unit—A unit tasked to provide a specific capability (UTC) as identified in the UTA database who is not directly responsible for developing the UTC. Non-Pilot Units must provide input to UTC development and changes to the Pilot Unit.
What is the 4 mandatory assessment information required if a units overall C Level is less that a C1
Issue, Impact, Fix GWD
How many days does an initial orientation training need to be completed by when a new Commanders arrive
90 days of their assissngment
list 15 things a concept briefer is required to brief during a concept brief (each correct answer is 100)
list is in AFI 10-303 A4.1
What is a WRMM List as much responsibilities for WRMM (each correct answer is 100)
Manage the unit’s PWRM
Develop and submit WRM budget requirements to the installation WRMO or WRMNCO
Participate in the installation’s WRM Review Board
Attend initial and recurring training
Inspect, maintain, mark, document, inventory, and store WRM IAW applicable instructions to include specific TOs, functional area instructions, AFI 23-101, and this instruction
Ensure equipment condition, maintenance, and management is accomplished in the Accountable Property System of Record.
What is LOGMOD UTC Suffix Code 0
Standard
Who are the minimum DCC Staff (each correct answer is 100)
IDO
NCOIC plans and and program
Log Plan
Personnel Rep
trans Rep
Materiel Management
Admin Support (LRS)
Unit Rep (as directed by IDO)