Excavation
Excavation prt2
100
what depth is shoring required
5'
100
what is desired open space around meter
3'
100
who coordinates and authorizes all shut-downs for gas (5.0.4 PG #2 3.2.2 )
GAS-D
100
who is responsible for safety on a excavation site
competent person
100
when using finform and hyd. shores is it acceptable to use only one shore. double points if correct
NO
200
what is max depth you can use candlevered sheet piling
10'
200
where is desired location of gas meter
outside whenever possible
200
HOW MANY BAGS DO YOU NEED ON 10" AND LARGER LOW PRESSURE ( 5.0.4 PG.#2 4.1.2 )
2 ON EACH SIDE UNLESS FOREMAN DECIDES NOT ENOUGH ROOM ,THEN ONE IN SEPARATE HOLE
200
who designates the competent person
employer
200
when sheeting is used it shall extend to the top of excavation
true
300
what does m.u.d. classify all soil as
c-60
300
what is the function of a e.f.v.
reduces or stops flow of gas
300
WHEN TAPPING LOW PRESSURE STEEL MAIN FOR BAGOFF WHAT DO YOU WELD TO MAIN AND WHAT MACHINE IS USED TO TAP IT.(5.0.4 pg#5 6.6 ) ( if you answer correct you can DOULBE yourPOINTS IF YOU CAN ANSWER QUESTION #1 ON MODULE 101)
THREADED HALF CPLG.- D-5
300
trench protection becomes mandatory at____ feet but access and egress are mandatory at this depth _____
5 and 4
300
does a trench shield prevent a cave in
no
400
who has stop work athority
ALL OF US
400
what is used to protect meter in high traffic areas
guard posts
400
WHAT IS THE PROCEDURE FOR AIR TESTING 18" GRADES A&B AND ALL GRADES 24"STEEL PIPE THAT WILL BE 125 # ( 1.4.1 PG. 1 NOTE )
LEAK TEST FIRST AT OVER 100# BUT NOT LESS THAN 148# FOR MIN. 1 HR. IF NO LEAKS THEN TEST AT 190# FOR SPECIFIED TIME
400
a worker can travel no more than _____ lateral feet to get to a ladder and it has to extend at minimum _____ feet above the top level of the excavation
25 and 3
400
if no sloping exists and the spoil pile is 2 feet back from edge does trench shield need to extend above ground level
no
500
person in charge of job is considered to be what
competent person
500
what is the required depth of gas service line in public property
18"
500
WHAT IS MAX. LENGHT FOR 10 MINUTE AIR TEST @ 100 # ON 4 " PLASTIC
315'
500
when sloping and using a trench shield what is the minimum the shield should be above toe of slope
18"
500
when using finform and hyd. shores how many finform and how many hyd. shores are needed to do a hole 3'-6" wide and 12' long 10' deep and no indication that soil will come in from under sheeting DOUBLE POINTS IF CORRECT LOOSE DOUBLE IF WRONG
6 shores,4 sheets