PCM
What is Pre-work Communication Meeting
The first option of loading a package when building a wall
What is Cornerstone Package?
The first step to a perfect 10 wall
What is cornerstone package?
A UPS program used to break jams, move diverters, or walk out belts
What is Conveyor Securing?
Formula for PPH
LIB
What is Left In Building?
The first method for loaders
What is "uses hand to surface"?
Ensure there are natural Ts in the wall to avoid these
What are columns?
What you would do to resolve an egress related issue
What is "address immediately"?
GA 3day
What is orange?
DECR
What is Daily Equipment Condition Report?
The part of the wall that gets unloaded third
What is the bottom right section of the wall?
What smalls should be
What is containerized?
When working in the yard, you must have both of these
What is a vest and cone?
MO 3day
What is blue?
SEAS
What is Service Exception Analysis System?
When bagging in small sort: Verify that the ___ and ___ numbers on the label match the information for the bag
What is bin and bag?
Gotta have at least 3 of these
What are Level Shelves?
If conveyor guards are not this, we must report it on the DECR and notify BASE personnel
What is Locked and Closed?
AZ 8640 1day
What is green?
HMI
What is Human Machine Interface
When loading: Long, not fragile - load horizontally at the side walls to prevent them from falling. ___________________
What is "Do Not Stand Upright"?
The second to last element of a 10 wall
What is "Retainer in ready position or flush to wall"?
What we must do if a package is generating smoke, fumes, or otherwise irritating
What is "Don't touch, secure my area by keeping employees away, and notify a designated responder"?
ID 8342 2day
What is orange?