General Palmer / History
Construction Facts
Capital Program
Toolkit
100

What year was the first Colorado Springs School established by Palmer

1871

100

The exterior facade of the addition is made out of this material, which was produced locally by a manufacturer named "Stresscon"

Precast Concrete

100

How many team members are there in the Capital Program

8

100

This Colorado Department publishes guidelines for use as a benchmark to ensure that new spaces—and modified existing spaces—meet modern educational, safety, and efficiency criteria. These guidelines include Sustainability, Code Harmonization, Safety Retrofits in Renovations, Site & Traffic Design and Space & Capacity Benchmarks

What is the Colorado Department of Education?

200

She, General Palmers wife,  actually started Colorado Springs first school in 1871.  

She named many of the city’s streets after rivers and streams the Denver & Rio Grande Railroad crossed, including Willamette, St. Vrain, and Cache la Poudre. She also named numerous rock formations around Glen Eyrie, the canyon home her husband built for her

Who is Mary Palmer or Queen Palmer?

200

There is over 10,000 cubic yards of this material -  that is placed as a liquid and then cures into a very hard material - for this project in the building and site. Thats the equivalent of the volume of 17 average homes.  

What is Concrete?

200

This number represents the total count of infrastructure and facility improvements completed by the Capital Program since the Mill Levy Override (MLO) passed in 2017

What is over 400?

200

This number equals the total cost of all needed repairs divided by the total replacement cost of the building. A lower score means a building is in good shape. A higher score means it needs major work.

What is an FCI

300

This publication has come out of Palmer High School every year since 1887.

What is the Lever? 

300

There is over 92,400 feet of pipe (Almost 7 Pikes Peaks) deep in the ground to support this function of the building.

What is heating and cooling? 

300

This is the total dollar value of all Capital Program projects completed since voters approved the 2017 MLO

What is 154 million?

300

This assessment has 234 questions and is used as a tool to determine if a school's design features and spaces (both interior and exterior) support learning and teaching well.

What is Educational Adequacy?

400

This focal point of the courtyard and an imporant part of Palmer traditions was made in 1879.

What is the Bell?

400

Our construction manager has a local team here and were tasked with hiring as many local subcontractors as possible.  They achieved over this percentage of local trade partners on the project.  

Over 90% (92%) to be exact.  The peak workforce on the site is about 165 people.  
400

This Capital Program FOCUS AREA teams up with educators to make immediate environment improvements while strategically planning essential, long-term facility projects.

What is maximizing how learning spaces serve teachers and students?

400

This Crime Prevention Through Environmental Design strategy places physical features, activities, and people in a way that maximizes visibility and ensures "troublemakers" feel exposed and watched.

What is Natural Surveillance?

500

When this part of the building opened, it was described as "One of the West's most attractive architectural designs"

What is the 1939 Building?  This building was built in conjunction with the WPA.  It cost $609,000 when it was built! 

500

This overall Construction Manager / General contractor was selected because they were the best partner, have amazing customer service, a local Colorado Springs office and teams and had the most competitive proposal for the Palmer Construction Project.  

Who is Adolfson and Peterson?

500

This D11 department coordinates with every school and every department in the District. Some departments are heavily involved at the beginning of a project or in the planning phase, some departments are involved throughout all phases, and some are only involved at the end.



What is the Capital Program?

500

What are Learning Environments, Athletics and Arts, Building Infrastructure, Code/Safety, Site Improvements, and Technology Infrastructure?  

What are Capital Program Improvement Categories categories?

M
e
n
u