Signs 101
Contract
Design-Build
Operations
Submittals / Approvals
Who's Who
100

Applied or embedded spheres that compose 3D characters for individuals who are visually impaired.

What is Braille

100

A portion of the contractor's earned funds withheld from each progress payment until the project is complete. 

Hint: 5 to 10% is a common amount withheld and is used as leverage to ensure that the work is indeed completed under contract.

What is Retainage

100

A calculation of anticipated costs based on designs and features to assist owners in developing a realistic budget estimate.

What is an ROM (Rough Order of Magnitude)

100

Current program used to generate work requests for specific deliverables.

What is SharePoint

100

These indicate how signage elements are to be fabricated, expanding upon the original design intent.

What are Shop Drawings

100

Oversees Engineering Department and advises both Production and Installation activities.

Who is John Keebler

200

Computerized programmable visual communication devices designed to display various or changing content.

What is an Electronic Message Center (EMC)

200

The point when construction is sufficiently complete in accordance with the contract documents, that the owner can occupy or utilize the building or space.

What is Substantial Completion

200

A view of a project site, looking down from above, showing its horizontal elements such as buildings, roads, boundaries, etc.

What is a Site Plan

200

Individual responsible for coordinating the Hand-Off meeting to discuss new project scope, schedule and budget.

Who is the Salesperson

200

Minimum distance that zoning ordinance requires must be maintained between a sign and property line or right-of-way.

What is the Setback

200

Oversees the vinyl department and interior signage final assembly

Who is Kari Kline

300

The process by which excess vinyl is removed from a sheet cut into the desired shapes or copy

What is Weeding

300

Written or graphic documents, issued BEFORE the execution of a contract that modify, clarify or interpret the bid documents.

What is an Addenda


300

This triggers the commencement of work beyond the initial design concepts.

What is Cost Approval

300

This spreadsheet is updated at least twice a month to determine what project costs can be distributed in the form of invoices.

What is the Billing Projections worksheet 

300

Indication that a fabricator may begin production as long as certain criteria is incorporated during the process.

What is Approved As Noted

300

Generates internal invoices, receives supplemental documents and verifies submittal of billing documents.

Who is Jenn Frymoyer

400

This general term describes a collection of sign types such as Directional, Identification, Informational and Regulatory that are planned to help guide viewers.

What is Wayfinding

400

An itemization of the costs of individual components, which comprise the total contract sum/price typically used for progress billing.

What is the Schedule of Values (SOV)

400

This is how many schematic design concepts are typically included in a Design-Build project.

What are Three

400

Once a subcontractor's invoice is received by L&H, this individual is responsible for receipt of the internal PO to process payment.

Who is the Project Manager

400

Singular deliverable, produced in full for review and if approved can be installed as part of the base scope.

Working Prototype

400

Creates installation packet to include site POC's, drawing packages and specifics regarding the work environment (PPE, Equipment, Access, Etc.)

Who is the Project Manager

500

Generic term that describes the manufacturing process that consists of shapes being cut out of material sheet goods (aluminum, PVC, wood) by a rotating bit.

What is Routing

500

The legal requirements in a construction contract that cover a wide variety of topics, issues, and problems that may arise once the project is under construction.

What are the General Conditions

500

This individual's role is responsible for obtaining client approval of costs associated with design concepts.

Who is the Salesperson

500

This document is created and distributed by the Project Manager to describe the specifics related to necessary site work.

What is the Installation Packet

500

The criteria to which all submittals are compared and remain the focal point of the original bid documents. 

What is the Design Intent


500

Installation Manager

Who is Tony Schiavo

600

A manlift with at least two knuckles or joints to allow access to hard to reach areas.

What is an articulating lift

600

A general term for AIA Document G703 which lists all scope items, values and percent-complete to supplement G702, Contractor's Application and Certificate of Payment.

What is the Schedule of Values (SOV)

600

What is Wayfinding

600

Platform used to display project health by analyzing data collected from both SharePoint and KIMCO.

What is PowerBI

600

Authorized to approve purchase order requests between $25,000 and $50,000

Who is the Executive VP

600

Responsible for the purchasing of materials and outsource services, by way of provided BOM's or purchase requests.

Who is Mark Rusak