Method to My Madness
Who Dat?
Construction
A & E
"Those other things"
100

Procurement professional requests pricing based on specifications from at least 3 vendors, for projects under $100,000.  Includes selection criteria in request. 

Request for Quote, or RFQ

100

Responsible for providing legal sufficiency based on ORS 291.047

DOJ

100

Construction Contractors must be registered with who to perform services for the State?

SOS and CCB

100

What is the threshold for a direct A & E award?

$100,000, including amendments and not a penny more.

100

What are WH-39 and WH-81 forms?

Bureau of Labor and Industries (BOLI) forms.

WH-39 is the public works fee information and WH-81 is the notice of public works.  These need to be submitted to BOLI for any prevailing wage rate jobs.  

200

The customer provides you specifications for goods or services exceeding $100,000.  Award based on lowest responsive, responsible offer.

Invitation to Bid, ITB

200

Responsible for drafting documents, reading entire document, and providing "first time quality" for review.

You!  

Do the citations match the reference?  Am I referencing the correct parties? Have I removed formatting marks before submitting?

200

What is the threshold for advertising Public Improvement solicitations in the Daily Journal of Commerce?

$125,000   (Sorry Dustin, had to) :)

200

When selecting an A & E Consultant, the higher scoring criteria should be based on what?

Qualifications

200
"Form" to be provided to the CCB upon award of a Public Improvement contract.  

Responsible Bidder Determination Form

It's actually a website

https://www.ccb.state.or.us/responsiblebidders/default.as


300

Solicitation requires vendor submit a solution or specifications.  Responses are scored and ranked for award.

Request for Proposal, or RFP.

300

Determines the amount and types of insurance needed.

The customer.

But... it's our job to ensure the required insurance types and amounts are (at a minimum) discussed.

300

This is the ORS used to determine how to proceed with construction contracts

279C... AND 279B if it is an ordinary construction, sometimes called a trade service.

300

Personal services, other than architectural, engineering, photogrammetric mapping, transportation planning or land surveying services, that are related to planning, designing, engineering or overseeing public improvement projects or components of public improvement projects

Related Services

300

Your contract is over $500,000 and the company you are awarding a contract to has over 50 employees.  What do you need to have them submit before the contract can be signed?

Pay Equity form

400
The roof, the roof, the roof is on fire!

Emergency procurement

400

Has the authority to sign the advice and verification forms for DAS?

Debbie Dennis.  This has not been delegated to Kelly Mix or anyone else.

400

These contain the Construction Specifications Institutes divisions and describe the work to be completed in a construction contract, and any requirements the Contractor must meet.

Attachment A of the PI/PW template... Specs! There are 50 divisions.

400

True or False... Proposals can be reviewed (sometimes called a debrief) before the awarded contract is signed.

False.  

279C.107 (b) The contracting agency need not open proposals for public inspection until after the contracting agency executes a contract.  

400

When a customer has selected a consultant from the AE Price Agreements, what is the first thing you need from your customer?

A justification or results from a mini-RFP.  

500

Construction solicitation requiring a finding of fact, and may require a public meeting.  The "may" is new. Also, the only construction process which allows for an RFP to be conducted.

Exempted Procurements

(Such as Construction Mangager/General Contractor (CM/GC), Design-Build, and Energy Savings Performance Contract (ESPC)

500

Provides language for federally funded contracts

The customer.  They know what the requirements are for spending those funds.

500

If a project is not completed by this date, liquidated damages apply.

Substantial completion.  The A&E work with the Contractor to determine a punch list to be completed by the Final Completion Date.

500

Can information on an engineer or architect's license type and status be found online?

Yes.  Oregon State Board of Examiners for Engineering & Land Surveying 

(https://online.myosbeels.org/#/verifylicense)

500

True or False?   Construction contracts ONLY have change orders, not amendments.  

False.  Amendments are even mentioned in the General Terms and Conditions.