QAPPs/SOPs
QA Track/Temperature Monitoring
Audits/Notebooks
Contracts/Records
100

What feature should be turned on in Microsoft Word before revising a QA document?

Track Changes

100

Who is responsible for taking corrective actions when a freezer is out of range?

The lab point of contact. QA Managers are responsible to ensure that corrective actions are taken, but not responsible to perform them.

100

For what point in a project can the QAM and Project Lead schedule a Technical Systems Audit (TSA)?

Before all data are finished being collected but after a significant amount of work has been done.

100

The QARF, SOW/PWS, and any necessary revisions to the EPA QAPP must be completed before or after contract award?

Before.

200

How many years can a QAPP remain active without any revisions?

5 years. But remember that you must revise the QAPP at any point that your project has changes. It will be rare that a QAPP is not revised for the full 5 years.

200

True or False? A QAPP/SOP officially becomes Active once it is uploaded to QA Track by the QA Team.

False. It becomes Active once a QAM signs the document.

200

What information is required on the front cover (first digital page) of a notebook?

Project ID, Project Title, Dates of Study/Notebook, QAPP Holder Names, and Notebook Custodian

200

What two QA documents must the contractor provide EPA after contract award?

QAPP and QMP

300

What are three reasons a QAPP must be revised (and re-signed)?

Change in the scope of the project resulting in new or revised project objectives

Changes in implementation such as how information will be collected, produced, evaluated or used

Changes in the design, construction, operation, or application of environmental technology

Change in the statement of work or workplan for extramural agreements

Changes in performance criteria as to how results will be assessed for acceptance 

300

DOUBLE JEOPARDY!!

True or False? The QA Team is responsible to notify the lab POC if a freezer (monitored by DicksonOne) is out of range.

False. DicksonOne will send notifications directly to the lab POC. 

*The only exception is if your freezer is still monitored by Logtag*

300

DOUBLE JEOPARDY!!

I finished collecting all data from my Category B project. Which type of audit must be performed on my project?

Audits are not required for Category B projects. But if an audit is requested by the Project Lead (or deemed necessary by QA staff) an Audit of Data Quality [ADQ] would be performed.

300

I have many old paper records that are past their retention date. What do I do with them? 

Fill out a Destruction Form and send it to Sara Linn. Once it is signed, you may appropriately destroy the records (shred or recycle).