100

The acronym  "OSHA" stand for

What is the Occupational Safety & Health Administration?

100

The ____________ must pay for PPE.

What is the Employer?

100

The ______  _______ steps of a ladder is restricted from being utilized.

What is the Top Two?

100

A confined space is defined as a space large enough for entry, limited means of egress, and a space ___________________.

What is "not intended for continous occupancy?

100

The sheet that list the name of a chemical, health hazards associated with the chemical, the PPE requirement when handling a chemical and has pictograms is called a ____________.

What is a Safety Data Sheet?

100

A permit is needed for air compressors that are used over _________PSI

What is  100?

100

At 40 feet the scaffold must be ____________.

What is designed?

100

There are document that must be in place prior to a crane mobilizing are _________, ____________, and _____?

What is the Certificate of Approval, Certificate of Inspection, and Certificate of Operation?

100

A standpipe is required when the building reaches_______.

What is 75 Feet?

100

When grinding a ceiling it is best practice to _____________ in order to not expose other workers to respirable silica.

What is restrict workers from the area who are not directly involved with the operations?

200

The OSH Act was passed into law in the year.

What is 1970?

200

The first method on the hierarchy of controls is ___________.

What is Elimination?

200

A straight ladder must extended _______ feet above the landing.

What is 3 feet?

200

Mushroom caps are an acceptable form of protection from rebar impalement. 

True or False

False


Mushroom caps are not allowed. 

200

I can hang the temporary lightening by placing metal screws in sheet rock and place the stringer on the screw. 


True or False

False

Sources of electricity must not be hung by conductive materials 

200

Fire extinguishers are required every ________ sqft, and no more than ________  feet travel distance. 

What is 1500 and 75?

200

A light weight scaffold can withstand _____PSI.

What is 25?

200

When Assembling and disassembling a crane an _____________ director must supervise the operation. 

What is a A/D director?

200

SOE are needed when the depth is more than _____ ft. 

What is 5 Feet?

200

It is best practice to use a ________ instead of a ladder when working at height above six feet.

What is a lift?

300

If there is a hazard at a workplace, but there is no specific OSHA standard covering this hazard, OSHA can still cite and fine an employer for that hazard. 

What is TRUE?

300

__________ is the last resort when trying to control a hazard.

What is Personal Protective Equipment?

300

A double ladder is required when there are ________ or more workers. 

What is 25?

300

The acceptable oxygen level is between _____________.

What is 19.5% and 23.5%?

300

Temporary walkways shall have a ________ amount of clearance. 

What is 5 feet?

300

______________ is not allowed on any construction site and immediate dismissal from the site is required if found.

What is Smoking?

300

Scaffold _______________ must be fully attached and may be used as a midrail.

What is cross braces?

300

A Licensed Rigger or Registered Design Professional is Required always is required for __________ operations. 

What is Critical Lift?

300

______________ can not be more than 3 stories below the working deck. 

What is stripping operations?

300

Toe board height is 

What is 5 1/2 inches?

400

Section 5a of the OSH Act of 1970 is called the ......

What is the General Duty Clause?

400

Fall protection must be used any time a worker is with in ______ feet from an elevated surface.

What is 6 feet?

400

Handrails are needed on stairwells when there are ___ or more risers.

What is 4?

400

Every ___________ feet after the initial hydro static test an repeat test must take place.

What is 100 Feet?

400

The CDA is located __________.

What is 9 Metro tech?

400

__________ must be obtained from the Safety Representative Prior to Operations and submitted at the when operations finish.

What is a Hot Work Permit?

400

Viewing Panels on a fence must be every ___________ft. 

What is 25 Feet?

400

____________ must be used to guide the load. 

What are taglines?

400

Reshored must be secured within __ft from the edge of the building?

What is 10 Feet?

400

Top rails must withstand ___ pounds of downward and outward force?

What is 200?

500

The general duty clause says that employers must furnish a ________________________________________.

What is a "workplace that is free from recognized hazards that are causing or likely to cause death or serious physical harm"?

500

A ___________ must be in place prior to removing protection. 

What is a Controlled Access Zone?

500

The ____________ must be opened and locked on a step ladder.

What is the metal spreader. 

500

Methane can not exceed _____ percentage of the LEL.

What is 10 percent?

500

A fence is required at a construction and demolition site ______________. 

What is always?


500

It is prohibited for portable space heaters to be use at construction site for human comfort.


True or False

True

500

A designed scaffold has to be inspected by an engineer  when it ____________, __________, and __________.

What is initial installation, every six months, and after repairs?

500

Crane operations must stop when wind speed reaches 

What is 30 miles per hour?

500

Outrigger scaffolds need a certain form. 

What is a CD-5?

500

Scaffolds must be have a height to base ratio of _____.

What is 4 to 1?

600

What is OSHA’s highest inspection priority?

What is an "imminent dangerous situation? 

600

A body belt is a form of fall protection.


True or False 

False.

A body belt is a positioning device and must be use with PFAS. 

600

Handrails must be free of ___________.

What are puncture hazards?

600

Compressed gases are considered in storage when the regulator removed and ____________ are placed on.

What are caps?

600

Horizontal netting shall be projected outwards ______.

What is 10 Feet?

600

License to used for torch operators. 

What is a G60?

600

Erector and dismantlement holds a _____ training certification.

What is a 32 hour Support Scaffold?

600

An assist crane.

What is a Derrick?

600

All sites must have a _____________ Plan.

What is a Site Safety Plan?

600

Cranes must stay away from power lines a certain distance. 

What is 20 feet?


700

The five categories of citations penalties are ....

What is Willful, Serious, Other than Serious, Repeat, and Failure to Abate?

700

Class G hardhats can resist 2,200 volts of electricity.

True or False

True

700

Stair pans must have ________ material before they are used to avoid tripping hazards. 

What is filler?

700

Three elements that cause a fire are ____________.

What is heat, oxygen, and fuel?

700

Horizontal netting is required  at ________ stories. 

What is 6 Stories?

700

The steps to extinguisher fire are 

What is P.A.S.S?

700

A ____________ must be attached to the lifeline while working on a suspended scaffold.

What is a rope grab?

700

Safety coordination meeting is used for __________  crane. 

What is a tower or crawler crane?

700

Best squad stands for ______________.

What is Building Enforcement Safety Team?

700

A__________ is required when the building is 20 stories or more in height. 

Whats is a CSFSM?

800

A willful violation cost approximately ____________. 

What is a $124K?

800

Prior to wearing a respirator a worker must have __________.

What is a FIT test?

800

Staircase landings must have a __________ around the open edge. 

What is a guardrail system?

800

___________ are the number one hazard of excavation. 

What are cave-ins?

800

A ________ and __________must be in place and readily accessible at all times when the building reaches 75 feet for the FDNY.

What is a Hoist and Standpipe?

800

The initial hydro static test must be done at _________.

What is 75 Feet?

800

A ________________ report must be on file before the scaffold can be used. 

What is an installation report?

800

All cranes and derricks must be equipped with an __________. 

What is an Anemometer?

800

Before excavation, you must notify the adjoining property __________ feet prior. 

What is 10 days?

800

______________ must be in the cabin of the crane. 

What are Load Charts?

900

When an OSHA compliance officer is explaining there reason for visiting the site, that is called the ______________.

What is the opening conference?

900

Anchor points must withstand ______ pounds?

What is 5,000?

900

Ladder are required when an excavation is ____ feet deep and every ________ lateral feet. 

What is 4 and 25 feet?

900

Three roles played in a confine space operation is the _,___, and _________.

What is Attendant, Entrant, and Entry Supervisor?

900

Security guard on a construction site needs a security license, ____________, and an OSHA certification. 

What is an S60?

900

Compressed gas cages must be _____feet apart

What is 50 Feet?

900

Scaffolds have to be ____feet away from the power lines.

What is 10 feet?

900

A _______________ must monitor the crane activity at all times. 

What is a Lift Director?

900

The working deck on a scaffold be fully __________. 

What is Planked?

900

Welder can have an one of three certifications. 

Whats is AWS, DOT, DOB Welding License?