This term is used to describe the result of an interaction with a hazard.
Risk
The online system used by Swift use to conduct safety risk assessments
ProSafeT
These are the four "pillars" of Safety Management Systems
Safety Policy, Safety Risk Management, Safety Assurance, Safety Promotion
This SMS process should be conducted prior to revision of an existing system.
Safety Risk Management
This term used for risk associated with or incidental to the introduction of a risk control
Substitute Risk
This person is designated as the Accountable Executive at Swift Air
Tim Rainey
This part of 14 CFR regulates Safety Management Systems in Aviation
14 CFR Part 5
These are two details that must be reviewed during the system analysis stage of an SRA.
Any two of the following
Function / purpose of the system, Operating environment, Personnel, equipment, facilities, interfaces
This term is used for measures implemented to help reduce risk to an acceptable level.
Risk Control
This form is used to conduct the manual revision process.
COP-02
These processes within the SMS function systematically to ensure the performance and effectiveness of safety risk controls and that the organization meets or exceeds its safety objectives through the collection, analysis, and assessment of information.
Safety Assurance (validation, process measurements also acceptable)
Risk associated with a hazard should be reduced to what level?
As Low as Reasonably Practical
This term is used for something that is harmless by itself, but can lead to safety events based on ones interaction with it.
Hazard
For this assessment (level) of risk, mitigation is required prior to acceptance.
High
The certificate holder must do this before a safety risk control is implemented.
Evaluate whether the risk will be acceptable with the proposed control applied (5.55d) (SRA is acceptable)
These are the four reasons safety risk management must be applied (Hint - SRM "Triggers")
1. Implmentation of new systems
2. Revision of existing system
3. Development of an operational procedure
4. Identification of hazards or ineffective risk controls through safety assurance