PPE
LOTO
Fall Protection
General
General
100
"Blank" Are responsible for the proper storage and daily care of their PPE

Employees

100

Where can you find DWTs Energy Isolation policy? 

SharePoint -> EHS Manual

100

Only "blank" person is allowed on the ladder cable at any given time

One

100
P-A-S-S when referring to fire extinguishers means? 
Pull, Aim, Squeeze, Sweep
100

Employees shalls not attempt to lift more than "blank" without assistance from another employee or use of mechanical aids

50lbs

200

Employees shall wear their eye protection to adequately protect themselves from "what" in the work area

Hazards

200

What are the steps in Hazard elimination? 

Engineering Controls (Elimination)

Admin Controls 

PPE


200

When climbing all employees shall maintain "Blank" . Always having a stable footing or grip. Unless utilizing a work positioning lanyard

3 points of contact

200

An activity within a hazardous area which (1) could potentially produce a spark, (2) involve a hot surface or heating surface, or (3) involve an open flame

Hot Work

200

An approach limit at a distance from an exposed energized electrical conductor or circuit within which a shock hazard (electrocution) exists.

Limited approach boundary

300

"what" shall be worn in work areas where there is a potential for injury to the head from falling or flying objects

Hard Hats

300

This person is trained on or knowledgeable in the recognition of applicable hazardous energy sources, and the methods necessary for energy isolation and control

Authorized Employee

300

PFAS stands for what?

Personal Fall Arrest System

300

These are symptoms of what cold related injury/stress - Shivering, confusion and loss of muscular control can occur. Poor performance; irrational decisions, not mentally alert. Can progress to a life threatening condition where shivering stops, the person loses consciousness and cardiac arrest may occur

Hypothermia

300

(Warning!): When lightning is detected within ____ miles. The site is required to stop all work at WTG's and site personnel are to take appropriate shelter

30

400

Any defects or concerns regarding PPE should be brought to their "what"?

Immediate supervisor

400

A mechanical device that physically prevents the transmission or release of energy, such as a manually operated circuit breaker, a disconnect switch or a valve

Energy Isolating device

400

Fall protection equipment and personal fall arrest equipment must be inspected by the user when?

Before each use

400

What hand signal does waving both arms back and forth horizontally mean

Stop everything

400

One who has skills training and knowledge related to the construction, specific work method and operation of the electrical equipment and installations and has received safety training to recognized and avoid the hazards involved

Qualified Electrical worker

500

All PPE issued to employees shall meet "Blank/Blank/Blank/Blank" Standards

OSHA/NIOSH/ANSI/NFPA

500

Blank or Blank energy (such as that in capacitors, springs, elevated components, rotating flywheels, hydraulic systems, compressed gas or water must be dissipated or restrained by methods such as grounding, repositioning, blocking, bleeding down.

Stored or residual 

500

In our SRK-11 we have a MCD. What does MCD stand for? 

Military compact descender

500

According to DWT policy, after 18 hours on duty. How many hours of time off are you required?

10 hrs

500

a type of worker that is not trained or knowledgeable in the work and must work under the direct supervision of a Qualified Electrical Worker

Unqualified Worker

M
e
n
u