This person is known as "The Draft King," "The Godfather of ACADE," and many more names, but only one given at birth.
Who is Chris Gatlin?
This transformer changed its make and model multiple times throughout design, including the most recent change only weeks before IFC.
What is Transformer 3?
EU00584401
What is the General Arrangement Drawing Number?
A P&C input that shows up on every relay drawing, inconsistently spelled in PPL standards as either one word or two words.
What is Crosstrigger? (one word!!!)
This pilot scheme could not be used on the Spring Mountain customer lines due to the extremely short line length.
What is POTT?
The original PPL development PM for the project
Who is Sean Zagwoski?
A broken IPP scheme infamous to PPL engineers that BMcD has offered to expand scope and redesign.
What is PA Solar?
The number of relay panel rows at ultimate buildout
What is 38?
This quality comment on the control cubicle bid package prompted major discussions with PPL Structural, affecting foundation design.
What is snow loading?
The minimum level of illumination required by PPL Standard at the substation fenceline.
What is 0.2 foot-candles?
The PPL LRE for the project
Who is Muhammad Anwar?
The total number of change orders according to the Chg_Mgmt DFS folders
What is 11?
The total number of circuit breakers in the substation according to IFC
What is 43?
The QC-only resource that spent the most hours on Tresckow.
Who is Kathy Hunter?
The only 230kV transmission line leaving Tresckow that requires a dual-DTT scheme due to a line-tapped transformer at the remote end.
What is East Palmerton?
The employee owner that spent the most hours on Tresckow
Who is Doug Reitmeyer? (over Josh by only 13 hours!)
A 90% challenge session comment that caused revisions to over 500 drawings.
What is the 2nd SCADA panel request?
The total number of distribution substations in Tresckow's remote end scope
What is 10?
Q4 reviewer of the AMS Point Assignment Sheet
Who is Erin Koczur?
A specialized type of grounding occasionally needed on substation capacitor banks as an alternative to direct neutral grounding, determined as not recommended for Tresckow.
What is peninsula grounding?
The co-op with the most hours on Tresckow
Who is Colin Cover?
The initial buildout of Tresckow according to Gate 0, Rev. 0
What is a four bay BAAH 230kV Switchyard?
The Thermal Rating Factor (TRF) of the metering CTs on Tresckow's 230kV circuit breakers.
What is 4?
The number of QTS forms submitted for Tresckow (within 10)
What is 120?
In rigid bus design, when increasing conductor phase spacing, the magnitude of this force decreases.
What is Short Circuit Load/Force?