PPE
PTP
Incident Reporting
Working at heights
General Safety
100

The word that is identified by the third letter "E" in PPE.

What is "Equipment"?

100

What is PTP stand for?

What is Pre-Task Plan?

100

What is consider a Near-Miss Event? 

What is an unplanned event that did not result in an injury, illness or damage but had the potential to do so?

100

When working off a ladder, at what height should the worker be 100% tie off? 

What is 4 feet?

100

OSHA

What is Occupational Safety & Health Administration?

200

The PPE that is required in all times at a Turner job site.

What are Safety Glasses, Type II hard hat, Work pants, Cut 4 rated gloves, construction boots, high vis vest and shirt with a minimum of 4" sleeve?

200

The PTP is reference to what document?

What is the JHA/ Job Hazard Analysis?

200

What is a recordable incident?

What is any incident that's be on First Aid that required stiches, hospitalization, prescription drugs that leads to lost time?

200

When using a Baker Scaffold at what height does it required the use of guard rails and the use of out riggers?  

What is 4 feet for guard rails and 5 feet for out riggers?

200

Required before performing a task that required a crane.

What is a Crane lift plan?

300

Types of PPE That's required when chipping, welding, grinding, cutting, and chiseling 

What are face shield?

300

What information you will find on a PTP?

What are the Task, Hazard and Hazard control methods?

300
The meeting points to gather in case of a fire in the plant.
What is the employee parking lot or the seconds pad?
300

Fall protection is required 100% when working at heights greater than.

Who is 6 feet?

300

At what depth does it required for a trench to be protected by an engineer system? 

What is 4 feet?

400

Type of PPE Required where arms are exposed to cut hazards such as working around studs, pull boxes tight confine space in celling and walls.? 


what are Kevlar, dyneema sleeves?

400

Types of permits required to be identified on a PTP

What is a ground penetration permit, ladders permit, lockout, Hot work, confine space, crane's, lifts/ scaffolds and dealing with hazardous substances?   

400
Safety Leader's office, Plant Leader's office, Department Leaders' office, and on the P Drive.
What is the location of the Emergency Action Plan?
400

The top rail of a fall prevention system should be at what height?.

What is 42 feet + or - 3inches?

400

How often should rigging equipment be inspected? 

what is Daily/prior to use?

500

Where an employee could be exposed to noise in excess of______ is required to wear hearing protection. 

What is 85 DBA?

500

Who is required to approved the PTP daily?

What is a Turner Superintendent?

500

How long should an incident or Near Miss regardless of how significant be reported to Turner and to who?

What is Immediately to any Turner Staff or Turner Safety?

500

Guardrail system must be able to withstand a force of ____lbs in all direction without fail.

What is 200?

500

What is consider a permit required confine space?

What is a closed space with a hazardous atmosphere with potential trapped gasses or walls that can collapse?