PSM
Scaffold
Fall Protection
Excavation and Trenching
Work Near Water
Electrical (Qualified and Non-Qualified
100

What does PSM stand for?

Process Safety Management.

100

What color tag indicates a scaffold is fully compliant and safe for normal use?

Green Tag.

100

At what height is fall protection required in Construction (OSHA 1926)?

6 feet or more above a lower level.

100

At what depth must a means of egress such as a ladder, stairway, or ramp be provided in a trench?

When the excavation is more than 4 feet deep.

100

What document must be completed and signed by all crew members before employees begin work over or near water?

A Task Safety Analysis (TSA).

100

What does ESWC stand for?

Electrically Safe Work Condition.

200

What OSHA standard does this SOP support compliance with?

OSHA 29 CFR 1910.119 Process Safety Management.

200

At what height must scaffold platforms have complete guardrails and toe boards installed?

When the work platform is 4 feet or more above the ground or next lower level.

200

What are the four levels of the Hierarchy of Controls for fall hazards?

  • Hazard Elimination
  • Passive Fall Protection
  • Fall Restraint Systems
  • Fall Arrest Systems
200

How far can an employee travel laterally in a trench to reach a ladder or other means of egress?

No more than 25 feet

200

When the danger of drowning exists, what must employees working over or near water be provided?

A U.S. Coast Guard-approved life jacket or buoyant work vest (PFD).

200

Who is permitted to work on electrical circuit parts or equipment that have not been de-energized?

Only Qualified Persons.

300

In a PSM-covered facility, who retains responsibility for the covered process and compliance with OSHA PSM requirements applicable to process operation, design, engineering, and maintenance?

The facility owner/operator.

300

What is the minimum width required for a scaffold platform under normal conditions?

18 inches wide.

300

What is the minimum strength required for an anchorage used in a personal fall arrest system?

5,000 pounds per employee attached.

300

How far must spoil piles, equipment, and traffic paths be kept from the edge of an excavation?

At least 2 feet from the edge.

300

Can employees work alone while performing work over or near water where a drowning hazard exists?

No. Employees are required to work in at least two-person teams and are not permitted to work alone.

300

What does GFCI stand for?

Ground-Fault Circuit Interrupter.

400

When must an incident investigation be initiated following a process safety incident?

As promptly as possible, but no later than 48 hours after the incident.

400

How many times the maximum intended load must a scaffold be capable of supporting without failure?

Four times the maximum intended load.

400

How often must all fall protection equipment be formally inspected and inventoried by a Competent Person?

At least quarterly.

400

What percentage of oxygen is considered the minimum safe level before precautions must be taken for atmospheric hazards?

19.5% oxygen. Precautions are required below this level.

400

What is the minimum length of line required to be attached to a ring buoy used for emergency rescue operations?

90 feet of buoyant heaving line.

400

What three electrical boundaries are Qualified Electricians required to understand?

  • Limited Approach Boundary
  • Restricted Approach Boundary
  • Arc Flash Boundary
500

Name three examples of routine and non-routine work authorization documents required under this procedure.

Hot Work Permit, Safe Work Permit, Confined Space Entry Permit, or Exception Procedure.

500

What is the minimum height that an access ladder must extend above the platform being accessed?

36 inches above the platform.

500

What is the maximum length allowed for a lanyard?

6 feet.

500

Under what two conditions is a protective system not required in an excavation?

  • The excavation is entirely in stable rock.
  • The excavation is less than 5 feet deep and a Competent Person finds no indication of a potential cave-in.
500

What is the maximum allowable spacing between emergency ring buoys?

No more than 200 feet apart.

500

What minimum score must be achieved on the Qualified Electrical Training Class written test?

80% or better.

600

Without written authorization through approved MOC processes, employees may not perform what five types of field changes?

  • Remove, bypass, alter, disable, or modify safety devices
  • Modify piping systems
  • Change equipment configuration
  • Modify process control systems
  • Defeat alarms or interlocks
600

What action must be taken if an employee cannot use a Self-Retracting Lifeline (SRL) on a scaffold ladder that is 10 feet or higher?

A variance request must be submitted to Corporate Safety.

600

A scaffold ladder accesses a deck that is 12 feet above the working surface. What additional fall protection is required?

A Self-Retracting Lifeline (SRL) is required unless deemed infeasible by a Competent Person and approved through the variance process.

600

How often must a Competent Person inspect an excavation?

Before the start of work, as needed throughout the shift, and after every rainstorm or other hazard-increasing event.

600

What three pieces of lifesaving equipment must be immediately available when employees are working over or adjacent to water?

  • Ring Lifebuoy
  • 90-foot Buoyant Heaving Line
  • Life Saving Skiff
600

Name three items of insulating or protective equipment that may be required when working on or near energized parts.

  • Insulated gloves
  • Insulated mats
  • Insulated tools
  • Shielding materials
  • Protective barriers
700

What documentation must be reviewed during a job walk when working with de-energized or tagged systems?

The isolation list and/or P&IDs (Piping & Instrumentation Drawings)

700

A supported scaffold has a height-to-base-width ratio greater than 4:1. What additional protection is required?

The scaffold must be restrained from tipping by guying, tying, bracing, or equivalent means.

700

List four situations that require completion of a Fall Hazard Risk Assessment (FHRA) before work begins.

  • Using a beam slider
  • Using a lanyard extender (cheater)
  • Using a structural plug
  • Transitioning on structural steel
  • Working near a leading edge/open hole
  • Exiting an elevated MEWP
  • Working from an angel wing platform
  • Working from a ladder with a 6-foot exposure
  • Using a safety monitor
  • Erecting/modifying/demoing hanging, suspended, engineered, or over-water scaffolds
700

Name four items that must be included in employee excavation training.

  • Safe excavation work practices
  • PPE requirements
  • Hazardous atmosphere procedures
  • OSHA Excavation Standard (29 CFR 1926 Subpart P)
  • Emergency rescue procedures
  • Non-entry rescue methods
700

List the first four actions the SOP describes when a person falls overboard.

  • Don't panic.
  • Immediately throw a lifebuoy and attachment overboard.
  • Raise the alarm by shouting "MAN OVERBOARD!"
  • Assign someone to continuously watch and point at the person in the water.
700

An employee is working around energized electrical parts. What two personal items are specifically prohibited by the SOP?

Conductive jewelry such as rings and necklaces.

800

What are four methods that can be used to verify employee understanding of PSM training?

  • Questions and answers
  • Group sampling
  • Trainer ratings
  • Oral or hands-on assessments
800

Name at least five of the eight responsibilities or capabilities of a Scaffold Competent Person.

  • Identify existing and predictable hazards
  • Inspect suspended and supported scaffolds
  • Ensure structural soundness
  • Evaluate galvanic action when different metals are used
  • Identify deterioration in scaffold components
  • Verify platforms can support imposed loads
  • Determine safe means of access
  • Determine and implement fall protection requirements
  • Ensure proper contact of base plates, mud sills, and foundations and recognize settling, wet soil, or erosion concerns
800

What are the three conditions that require an employee to be retrained in fall protection?

  • Changes in the workplace make training obsolete.
  • Changes in equipment make training obsolete.
  • Employee knowledge or behavior indicates training has not been retained.
800

Atmospheric testing is required in excavations over what depth when a hazardous atmosphere exists or may reasonably be expected?

More than 4 feet deep.

800

What special requirements apply to PFDs according to the SOP?

All PFDs must have an approved light and approved retro-reflective material installed.

800

Name four abilities a designated Electrical Competent Person must possess.

  • Electrical theory knowledge
  • Circuit diagnostics and troubleshooting
  • Blueprint reading
  • Electrical code compliance
  • Equipment maintenance
  • Wiring and installation skills
  • Safe isolation procedures
  • First aid and emergency response
900

Name the five actions employees are prohibited from performing without written authorization and approved MOC processes.

  • Remove, bypass, alter, disable, or modify safety devices
  • Modify piping systems
  • Change equipment configuration
  • Modify process control systems
  • Defeat alarms or interlocks
900

At what scaffold height are engineered drawings required, and who must approve them?

Any scaffold over 125 feet high requires design drawings that must be approved and sealed by a Qualified Person (licensed professional engineer) and kept on site.

900

A worker is performing temporary, infrequent work on a low-slope roof more than 15 feet from the roof edge and no conventional fall protection is being used. What control must be implemented?

A Safety Monitor must be used to ensure employees do not come within 15 feet of the roof edge. The Safety Monitor's sole responsibility is monitoring the work.

900

A trench is sloped using the maximum allowable slope identified in the SOP. What is that slope ratio and angle?

1.5 horizontal to 1 vertical, which equals approximately 34 degrees measured from the horizontal.

900

A winch line is under tension. According to the SOP, what is the danger zone around the line?

Employees must stay out of the area within 15 degrees on either side of a line under tension and never stand in, on, over, or in line with the cable.

900

A piece of equipment must be operated near overhead power lines. What is the minimum clearance distance required for uninsulated lines less than 50 kV?

20 feet.

M
e
n