Backlog Management
Quality Control
Components of a User Story
Agile Testing
PQSST Members
100

I manage the backlog

Who is the product owner?
100

All team members are responsible for THIS despite common misconceptions

Who is responsible for Quality Assurance?

100

A prediction of how long it would take to deliver a story

 What is a time estimate?

100

An error detected in the code; is also a Volkswagen Beetle

What is a bug?

100

This team member spends a lot of time playing, and competing playing billiards in their free time.

Who is Abagayle Shane?

200

The ranking of stories in order of importance

What is Prioritization?

200

Reusable and detailed test cases are required for THIS

 What is needed for automation?

200

An informal and general explanation of a feature or function written from the perspective of the end user

User story/user statement

200

Sequence of steps to test the functionality/feature

What is a Test case?

200

This team member loves cats and chocolate, both of which have something similar to their first name.

Who is Chiara Manassero?

300

Agile Ceremony (Meeting) to discuss stories in the backlog and give sizing

What is refinement or grooming?

300

A comprehensive document that describes the approach to performing software testing.

What is a test strategy document?

300

A split of an issue into smaller pieces/steps to help make stories more manageable, ensure completeness of the SDLC, or assign multiple people to parts of a story

What is a subtask?

300

A quick test to see if the application "catches on fire"

What is smoke testing?

300

While this person is not a fan of pets, they now have 1 fish, 1 bearded dragon, 4 chickens, and 4 children!

Who is Joanna Bu?

400

Use the backlog to show the _____________ of things that are coming

Who are stakeholders or client?

400

Tests are written before the actual code.

What is Test Driven Development? 

400

Guidelines and perspectives as well as additional specific settings that will that set conditions for the user story to be considered done.

What is acceptance criteria?

400

This artifact, or series of artifacts describes the scope, approach, risk, and test deliverables; has same initials as toilet paper.

What is a test plan?

400

This person and their family have hosted over 30 children in need of a safe and loving home in their own home over the past 12 years

Who is Brian Barnett?

500

This tool helps visualize the over all goal, sequencing, or timeline to help manage a backlog or deliver a solution.

What is a roadmap/product roadmap?

500

The artifacts created during the testing process needed to plan, design, and carry out tests.

What is testware?

500

A series of stories or tasks that result in a comprehensive often larger function or feature 

What is an epic?

500

This type of testing ensures the older deployed code still works.

What is regression testing?

500

This PQSST Member likes to spend time underwater.

Who is Rodolfo Iacopetti?

M
e
n
u