Protecting Cast iron pipes
Excavations
Heavy Loads
Bell & spigot joints
AOC
100

Protect disturbed cast iron from.....

Vibrations, impact forces, earth movement

100

Replacement pipe should be _____ to extend an approximately equal distance on each side

centered

100

Whenever a heavy load is imposed over cast iron

Contact corporate engineering

100

WGL does not operate cast iron pipe at pressures____ ____ psig.

greater than 25 psig

100

AOC

Abnormal Operation Condition

200

Permanent protection must _____ or ______ than design and construction requirements

Equal or greater

200

Other conditions where consideration for protection should be given include

Water leaks, sewer failures, excavation for construction, Excavation for repair

200

Methods of protecting cast iron from heavy loads include

Matting

Steel plates

200

If joint that is subject to pressures of 25 psig or less, ___________

Seal by means other than caulking

200

Incorrect mechanical fitting

Human error

300

Less than 3'________________________________________________________________

monitor for properly compacted backfill and appropriate support

300

Realign Cast iron pipe

False

300

too preserve the integrity of pipeline

Remove heavy loads

300

If plastic is used, _____ or _____ #12 copper wires

bond or clamp

300

Gas leak

AOC

400

More than 3' exposed pipe

Replace 8" and smaller pipe to a distance outside of soils angle of repose

400

Where cast iron is disturbed or could be disturb

Support with bridging bracing, suitable backfil material

400

Perform special surveys ____ and _____ heavy loads

before and after

400

_____ the leak or damage.

Evaluate

400

Heavy equipment over site

Human error