🛳️ All Hands on Comm!
📋 Maritime Mind Game
100


This document outlines how cargo will be loaded or unloaded.


Cargo Plan

100


The ship must immediately report this if it occurs during loading or unloading.


damage to the ship


200


 Name one piece of ship information that must be sent to the terminal before arrival.



ship’s name, call sign, or IMO number


200


Damage caused by improper loading may affect which part of the ship?



ship’s structure or hull


300


A short meeting held after operations to discuss improvements.



debriefing


300

Effective communication throughout operations helps achieve these two main goals.

safety and efficiency

400


The procedure used to confirm vessel stability during cargo operations



 draught checking


400


What is one example of emergency response equipment kept ready on board?



oil spill cleanup or firefighting equipment


500


Sharing this operational detail helps synchronize ballast operations with cargo loading.



time required for de-ballasting


500


Any additional information requested by the terminal should be included in this exchange.


Pre-Arrival Information Exchange?


M
e
n
u