Herbicides
Safety & You
2015 Specs Update
Timesheets
Customer Sat.
100
The most important feature to look for BEFORE herbicide treatment
What is water?
100
This form must be filled out by the person(s) who caused a contractor related outage.
What is VM Contractor-Caused Damage/Interruption Report (Who What When Why Form)?
100
All woody vegetation shall be removed, treated & pruned Ground To Sky with no overhang for a distance of five (5) feet from the fence line, buildings/facades
What are Substation Clearance requirements?
100
These should be done daily and not at the end of the week.
What are Timesheet entries?
100
The golden rule when working with a customer.
Pretend you're the customer
200
The company that was taken over by Bayer and will still have labels associated with herbicide mixes for 2015.
What is DuPont?
200
The number of outages in 2015
What is 2?
200
Typically indicated as double lines on the distribution circuit maps & entire subtransmission circuits.
What is the Main Feeder?
200
This is the release # is for all profit work.
What is 6?
200
A crucial component when speaking with a customer.
What is Eye Contact?
300
This herbicide was designed to help land managers maintain desired grasses without sacrificing brush control.
What is Streamline™?
300
When this occurs, contractor personnel shall immediately inform the DLC inspector of the incident & provide all relevant information (i.e. contractor foreman name, injuries sustained, circuit & pole #’s, etc…)
What is Any accident, incident, or near miss?
300
When the base of the LTE tree is greater than ___ from the outermost conductor: Trees along the LTE which break the ____ measurement shall have all encroaching portions properly pruned to laterals beyond the flagged plane limit or be completely removed to the main stem.
What is 20 ft plane?
300
The new WO# for all firm bid work in 2015 starts with these two letters
What is MO?
300
Making this facial expression is a winning technique with customers.
What is Smiling?
400
Before you spray, you must do a specific type of survey
What is Site Survey?
400
The number of contractor caused primary interruptions for 2014
What is 6?
400
Contractor shall electronically measure & visibly mark with flagging, a horizontal distance of 35 ft from the outside conductor towards each LTE.
What are Undeveloped transmission ROW measurement specifications?
400
This timesheet code is for the re-work disposal/clean-up of wood and debris.
What is RDS?
400
When a customer is speaking, to ____ after they finish a sentence.
What is Ask Questions?
500
A Type of Herbicide with Low toxicity, Environmental profile, ½ life, No soil activity, Slow “brown-out”, Long application season, Superior pine control at any time, Very little impact on herbaceous vegetation
What is KRENITE-S?
500
This year was the worst year for contractor caused outages
What is 2014?
500
In 2014, this was part of the main feeder spec. Now for 2015, it only requires 4 years clearance
What is Aerial Cable?
500
Indicate this when working overtime or double-time with your locations
What are start and stop times?
500
Most people have the “ ____ GENE”.
What is Care?