Welcome/Intro
STORMS
PreCon
ArcFM
Meter/EFV Sizing Tool
100

Name the three managers who helped welcome the group.

Shawn Losch, Shawn Stone & Travis Peterson

100

DAILY DOUBLE!!!

What do CU & MU stand for?

100

Who is responsible for calling in locates?

Contractor that is doing the work

100

What button do you click on to locate a customer?

Customer Locator Tool/Elvis

100

What's the MAOP of new medium density PE pipe?

60 psig

200

I like salmon fishing.

Andrew Baker

200

If you only have the "Material ID #"  or "Item ID#"and wanted to find the CU, what would you click on?

Material/CU Xref

200

Who is responsible for holding the Pre-Construction meetings?

Project Manager & or Construction Coordinator/Manger

200

How would you locate & zoom in to a community?

Click on "ArcFM Locator", select "Community Boundaries" & type in the community name.  Be sure "auto zoom" is check and click "search"

200

What was the lowest "System Operating Pressure" option on the "System Operating Pressure" drop down?

4-9 lbs

300

My safety share was that the parking lot had already started to freeze, who am I?

Craig Morris

300

What does SBOM stand for?

Summary Bill of Materials

300

Where can you locate the Pre-Construction spreasheet?

V-Drive

300

How do you create a map with a border that you can print?

Click on the drop down in the top/middle, click on "page template" and select the page template you need. 

300

Where do you find the MTR/EFV Sizing Tool?

Go to the "Gas Engineering Home Page" and click on the link.

400

I had nothing interesting to share.

Stephanie Gillick

400

What do do the letters MPP04 stand for?

Main Pipe Plastic 4"

400

Daily Double!!!

What endangered species was referenced in the PreCon training?

400

This can help you determine if you'll lose customers when preparing a GOS.

Squeeze or valve isolation trace

400

What kind of large customer did I talk about during this training?

Transport

500

I like to ride my Harley.  Next year I plan to ride out to California & up the west coast.

Shawn Losch

500

If you wanted to print off a condensed version of the "job card", what form would you print off?

WR As-Built MUs/CUs Pt by Pt

500

Give 4 examples of who should be invited to a Pre-Construction meeting?

Construction Coordinator/Manager, Field Engineer, Local Manager, Project Manager, Contractor performing the work, Local Ops, M&R, Inspector, Locator, Local Agencies (city, county, state, DOT)

500

How do you create a customer list using the "polygon" tool?

Click on the polygon tool, create your boundary, then click on reports, customer meter report

500

What are the two sizing methods you can use with this tool?

Customer Load or Installed Meter Capacity

M
e
n
u