Brine standard
What is the cleanest tank cleaning standard according to GOMO?
According to Preplanned stowage plan
How is deckcargo to be stowed?
No people on deck while cargo moves or lines under tension
What is clear deck policy?
Remain outside and look out for the safety of the team.
What is the task of stand by personnel?
Must be separated from other cargo according to class
What is dangerous goods?
The company SMS system did not adequately cover the tasks being carried out in this case.
What is one conclusion on the Skandi Pacific case?
Scuppers, detergent and other equipment for environmental incidents
What is SOPEP
Dangerous goods class 1
What is explosives?
Management of Change process was inadequate
What is one of the conclusions on Skandi Pacific?
Pressure tanks
What is tanks for cayying drybulk?
require special attention due to the nature of the cargo and the risk of shifting cargo during transit
What does tubular cargo require?
-Call and inform of ETA
-Prepare checklist
-Start up thrusters and engines according to operation
-Confirm readiness from vessel
-Obtain permission to enter 500 m zone
-Approach without heading towards the rig
-Setup for operation 1,5-2,5 ships lengths from inst,
-Approach slowly for final work location
What is correct approach to a rig
Picking a container at the middle of a block
What is cherry picking - and it is not allowed?
Arrival to instalations after loading in port for a vessel must happen
What is according to preplanned operation
Everybody involved in the operation
Who is responsible for the vessel being operated as fuel efficient as possible?