Emergency Response
Corrosion and AOC's
Design, Construction, and Testing
Transmission and Stations
Leak Management & Reporting
100

The radio channel that all communications will be switched to in an emergency situation.

What is Channel 2?

Plan, Chapter 6, part 2b

100

A condition identified by the operator (YCNGA) that may indicate a malfunction of a component or deviation from normal operations tha may; indicate a condition exceeding design limits,: or result in hazard(s) to persons, property, or the environment.

What is Abnormal Operating Condition?


Procedures, chapter 8, page 106

100

Number of tiers for steel pipe size of 4".

What is 14?


Procedures, chapter 3, part 1, page 17

100

The maximum pressure at which a pipeline or segment of pipeline may be operated.

What is the MAOP (Maximum allowable operating pressure)?

Plan, chapter 3, part 3, page 19

100
Frequency of inspection for non-business districts.

What is every 5 years?


Procedures, chapter 5, part 2, table

200

The person that handles inquires from the press and other interested parties if the VP of Regulatory Compliance and System Planning is unavailable. 

Who is the Marketing and Promotions Manager?


Plan, chapter 6, part 1, page 70

200

This must be connected to the pipeline so as to remain mechanically secure and electronically conductive.

What is the test lead wire?


Procedures, chapter 4, part 4, page 63 or 118

200

Location of excess flow valve installation requirements.

What is Engineering Standard EFV-002?


page 44 of 111

200

These "smaller scale" pressure limiting and relief devices are typically used to serve a single customer located some distance away from a distribution main.

What is a farm tap?


September 2019 O&M review session. 

200

The time frame that grade 2 leak should be re-evaluated, prior to resolving/correcting the leak.

What is at least every six months?


Procedures, chapter 5, table 2, page 93 of 118

300

Reference used during a Level 3 and 4 incident.

What is the Standard Operating Procedure (SOP) for Management Communication?

Plan, Chapter 6, page 69

300

In 2026, this meter inspection area will be checked/inspected for atmospheric corrosion.

What is Area 3?


Procedures, chapter 4, part 7, page 71 or 118

300

Areas that extends 220 yards on either side of the centerline of any continuous one-mile length of the pipeline.

What is class location unit?


Plan, Chapter 3, part 2

300

Pipelines in this excess should be braced or supported with slings to minimize axial stresses.

What is 20 feet?


Procedures, Chapter 8, page 107

300

The date the annual report for YCNGA and PEG should be submitted to PHMSA.

What is March 15th of the preceding year?


Plan, Chapter 2, part 2

400

An outage lasting more than _____ requires a "complete written report" made to PSC and ORS is required, after restoration of service.

What is 6 hours?


Plan, Part 2, page 76

400

Unforeseen malfunction of equipment.

What is an AOC?


Procedures, chapter 8, page 106

400

Revision of MAOP must be completed within ______ of the change in class location.

What is 24 months?


Plan, Chapter 3, part 3, page 21

400

May be used as an early warning agent to disclose system failures, malfunction, or line hits.

What is telemetering?


Procedures, chapter 5, part 2, part D

400

Inspections of farm taps must not exceed intervals of this length, but should be completed at least once within this separate time frame.

What is 15 months/1 year?


September 2019 O&M Training

500

The person must be notified, in the event of an immediate threat to life, before closing any mainline valves on pipelines operating above 100 psi.

Who is the Director of Operations?


Plan, chapter 6, page 73

500

Corrosion present. Minor pitting throughout, will not affect the safe operation of the pipeline before next schedule inspection. 

What is moderate?


Procedures, chapter 4, part 7, page 68

500

Dents that are more than ______ deep must be removed by cutting out the faulty portion of the pipe as a cylinder.

What is one-quarter inch?


Procedures, chapter 3, page 20 of 118

500

Each pressure reduction station must included _______ located a sufficient distance from the above ground station piping.

What is outlet isolation valve?

Procedures, chapter 5, page 77

500

Each customer, with underground house piping, should receive a notification within this amount of time after the customer receives gas.

What is 90 days?


Plan, chapter 2, page 13

M
e
n
u