The main purpose of project planning is to guide ______.
a)What is Execution?
b)What is Operation?
c)What is Completion?
d)What is Success?
What is execution?
Plan that coordinates all other project plans
a) What is "Scope management plan"?
b) What is "Project Management plan"?
c) What is "Requirements management plan"?
d) What is "Milestone list"?
What is the "project management plan"?
First process in project scope management
a)What is "Creating scope plan"?
b)What is "Planning scope management"?
c)What is "Project planning"?
d)What is "Creating project"?
What is "Planning scope management"?
Meaning of the acronym WBS
a)What is "World Breakdown System"?
b)What is "Work Breakdown Structure"?
c)What is "Work Better Succeed"?
d)What is "Want Better Success"?
What is "Work Breakdown Structure"?
Name of this format for a WBS

a)What is Idea?
b)What is Mind?
c)What is Tabular?
d)What is Graphical?
What is Graphical (or Chart)?
End of the saying, “If you fail to plan…”
a)What is "You fail"?
b)What is "You plan to fail"?
c) What is "You succeed"?
d)What is "You do nothing"?
What is “you plan to fail”?
Examples of these include activity attributes, assumption log, project schedule, and risk register
a)What are "Project documents"?
b)What is "Project charter"?
c)What is "Project pitch"?
d)What is "Project statement"?
What are "Project documents"?
A project ________ describes product characteristics and requirements, user acceptance criteria, and deliverables.
a)What is "Scope statement"?
b)What is "Scope plan"?
c)What is "Management plan"?
d)What is "plan"?
What is "Scope statement"?
Lowest level of WBS
a)What is "First level"?
b)What is "Work details"?
c)What is "Work package"?
d)What is "Work chart"?
What is "Work package"?
In WBS there should be no verbs, as verbs represent action, and a WBS is not about action, but rather about deliverables. What is a better way to name “Analyze Survey” on a WBS?
What is a "Survey Analysis"?
Number of knowledge areas that include planning processes
a) What is Three?
b) What is Ten?
c) What is Five?
d) What is Non of the above?
What is all of them (or ten)?
As opposed to static (unchangeable), project management plans should be this
a)What is Variable?
b)What is Constant?
c)What is Changeable?
d)What is Flexible?
What is Dynamic or Flexible?
This is an example of one
a)What is "Requirement matrix"?
b)What is "Scope traceability matrix"?
c)What is "Requirements traceability matrix"?
d)What is a "Table"?
What is "Requirements traceability matrix"?
In the WBS, the whole project is considered to be this level
a)What is "Level 10"?
b)What is "Highest level"?
c)What is "Level 1"?
d)What is "Boss Level"?
What is "Level 1"?
A starting point or measurement that can be used for future comparison
a)What is a "Benchmark"?
b)What is a "Guideline"?
c)What is an "Anchor"?
d)What is a "Baseline"?
What is a "Baseline"?
Often the most difficult and unappreciated process in project management
a)What is Execution?
b)What is Planning?
c)What is Analyzing?
d)What is Completion?
What is Planning?
The ______ guidelines section of a team contract describes items like arranging telephone or video-conferencing, developing and following agendas, etc.
a)What is Acceptance?
b)What is Success?
c)What is Performance?
d)What is Meeting?
What is Meeting?
The tendency for project scope to continually increase
a)What is "Scope deadline"?
b)What is "Scope creep"?
c)What is "Scope timeline"?
d)What is "Scope maturity"?
What is "Scope creep"?
Project work on a WBS is based on ________, not activities.
a)What are Outcomes?
b)What are Actions?
c)What are Deliverables?
d)What are Activities?
What are Deliverables?
______means formal acceptance of deliverables by the customer and other identified stakeholders
a)What is Validation?
b)What is Verification?
c)What is Signature?
d)What is Determination?
What is Validation?
End of the saying, “What gets measured…”
a)What is "Gets done"?
b)What is "Gives results"?
c)What is "Succeeds"?
d)What is "Gets managed"?
What is “gets managed?”
Other plans that the project management plan refers to, such as the scope management plan, risk management plan, etc. are called ________ plans
a)What are Subsidiary plans?
b)What are Partial plans?
c)What are Complementary plans?
d)What are Secondary plans?
What are Subsidiary plans?
People who ___ the work should help to plan the work on a project
a)What is "Pay for" the work?
b)What is "Own" the work?
c)What is "Do" the work?
d)What is "Manage" the work?
What is "Do" the work?

As shown above, approach for creating a WBS that that uses branches radiating out from a core idea to structure thoughts and ideas
a)What is "Idea mapping"?
b)What is "Mind mapping"?
c)What is "Project mapping"?
d)What is "Task mapping"?
What is "Mind mapping"?