What does LPSA stand for?
LOSS
PREVENTION
SELF-ASSESSMENT
How do I find the "Weekly Safety Communications"?
What does COD stand for
Control of Defeat
What SSS (Site Safety Standard) should our Work Plans follow?
SSS 5100
What equipment is R5102?
Second Reactor on Line 5
What are the 3 categories to LPSA?
ASSESS
ANALYSE
ACT
Where do I go to find SDS (Safety Data Sheets)?
PSIMS
What does LPS stand for?
Loss Prevention System
What does EICL stand for?
Energy Isolation Control Log
What equipment is D3099
TEAL Storage Drum
Who is allowed to perform a LPSA?
Anyone.
Where do I find Equipment Drawings?
BTCX Vault or Console Binders
What does SWPT stand for?
Safe Work Practice Team
Who can create a Work Plan
A Competent Planner
What equipment is WF 604
Single Weigh Feeder on 601
Assess the risk!
what are the two questions you ask?
What could go wrong?
What is the worst that could happen if something does go wrong?
Where do I find the DWS (Daily Work Schedule)?
Email or I drive/BTCP/BAPP/OpsBD/DWS
What does JLA stand for?
Job Loss Analysis
What is a CSE?
Confined Space Entry.
What equipment is P8753
Oil Skimmer Pump
When do you do a LPSA?
Before beginning any activity / task / job.
After a loss or near loss, or any unusual circumstance
Where do I go to find Equipment Procedures?
I/BTAREA/Stars/BAPP/line
What does OIMS stand for?
Operations
Integrity
Management
System
The PIP Tag may only be installed when all of the following are complete:
All required EIDs and EVPs in the Energy Isolation Envelope are in place.
All Required EIDs and EVPs are properly tagged.
All required verifications have been completed and documented on the EICL
1. Initial Verifier
2. Permit Recipient
3. Independent Verifier
What equipment is SP4801
4742 Knock-out Pot