LPSA
How do I find...
What does that mean?
Work Plans
do I know my line?
100

What does LPSA stand for?

LOSS

PREVENTION

SELF-ASSESSMENT

100

How do I find the "Weekly Safety Communications"?

Email

100

What does COD stand for

Control of Defeat

100

What SSS (Site Safety Standard) should our Work Plans follow?

SSS 5100

100

What equipment is R5102?

Second Reactor on Line 5

200

What are the 3 categories to LPSA?

ASSESS

ANALYSE

ACT

200

Where do I go to find SDS (Safety Data Sheets)?

PSIMS

200

What does LPS stand for?

Loss Prevention System

200

What does EICL stand for?

Energy Isolation Control Log

200

What equipment is D3099

TEAL Storage Drum

300

Who is allowed to perform a LPSA?

Anyone.

300

Where do I find Equipment Drawings?

BTCX Vault or Console Binders

300

What does SWPT stand for?

Safe Work Practice Team

300

Who can create a Work Plan

A Competent Planner

300

What equipment is WF 604

Single Weigh Feeder on 601

400

Assess the risk!

what are the two questions you ask?

What could go wrong?

What is the worst that could happen if something does go wrong?

400

Where do I find the DWS (Daily Work Schedule)?

Email or I drive/BTCP/BAPP/OpsBD/DWS

400

What does JLA stand for?

Job Loss Analysis

400

What is a CSE?

Confined Space Entry.

400

What equipment is P8753

Oil Skimmer Pump

500

When do you do a LPSA?

Before beginning any activity / task / job.  

After a loss or near loss, or any unusual circumstance

500

Where do I go to find Equipment Procedures?

I/BTAREA/Stars/BAPP/line

500

What does OIMS stand for? 

Operations

Integrity

Management 

System

500

The PIP Tag may only be installed when all of the following are complete:


All required EIDs and EVPs in the Energy Isolation Envelope are in place.

All Required EIDs and EVPs are properly tagged.

All required verifications have been completed and documented on the EICL  

1. Initial Verifier

2. Permit Recipient

3. Independent Verifier

500

What equipment is SP4801

4742 Knock-out Pot